Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penerapan weekly order change untuk mengurangi jangka waktu pemesanan komponen ekspor di PT Toyota Motor Manufacturing Indonesia
Author
Sompie, Kevin Alim
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 03022007/IND/2016
Subject(s)
PRODUCTION CAPACITY
PRODUCTION MANAGEMENT
Notes
Appendix: p. 57-69
. Bibliography: p. 56.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 69 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02535/16
(T) IND 2007
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Penurunan biaya kualitas di PT X
Analisa penurunan reject rate produk plastic tube di p.t. x
Perancangan buffer size yang optimal dalam mengatasi MRP nervousness dengan memperhatikan tingkat inflasi
Finding profit
Upaya penurunan downtime pada mesin winding di PT. Lotus Indah Textile Industries Surabaya
Perancangan keseimbangan lintasan produksi dan penentuan jumlah operator yang optimal di perusahaan Mebel
Identifikasi dengan menggunakan value stream mapping waste dan upaya perbaikan kinerja di gudang PT. Y
LKP : CV Dwi Jaya