Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan sistem perencanaan dan penjadwalan produksi di cv. Toyobo
Author
Arifin, Jimmy Johanes Teguh
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0693/IND/2003
Subject(s)
PRODUCTION PLANNING
PRODUCTION SCHEDULING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 113 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01147/04
(T) 658.53 Ari P
-
Unavailable : Lost
Similar Collection
by author or subject
Perencanaan fasilitas dan sistem kerja dengan pendekatan ergonomi pada bagian pengebalan di departemen SKT Rungkut-2 PT "X"
Perbaikan sistem ppic dengan pendekatan mrp ii pada bogasari flour mills
Quality function deployment
Relokasi pabrik filter dengan mempertimbangkan perencanaan produksi filter di PT Nojorono Tobacco International
Analisa alur produksi pada proses fabrikasi piping proyek TP 11 S di PT. Gunanusa Utama Fabricators
Integrasi model perencanaan produksi agregat dan perencanaan kebutuhan mesin di PT. Avi
Upaya peningkatan produktivitas pada line mounting di PT Panggung Electric Corporation
Perancangan sistem penjadwalan flexible flow line dengan ultimate buffers and setup di PT. Kerta Rajasa