Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan sistem perencanaan dan penjadwalan produksi di cv. Toyobo
Author
Arifin, Jimmy Johanes Teguh
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0693/IND/2003
Subject(s)
PRODUCTION PLANNING
PRODUCTION SCHEDULING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 113 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01147/04
(T) 658.53 Ari P
-
Unavailable : Lost
Similar Collection
by author or subject
Pengurangan setup dalam usaha pengoptimalan investasi
Perencanaan penjadualan pada departemen produksi di PT Integra Indocabinet
Perancangan sistem informasi dan perencanaan produksi di PT. Salim Brothers Perkasa
Perencanaan produksi dan pengendalian kualitas produk di pt. mulcindo steel industry
Reinventing the factory
Algoritma heuristik HFC untuk penjadwalan flowshop tanpa mempertahankan karakteristik permutation
Peningkatan produktivitas produk D16D di assembly line A PT Astra Otoparts divisi Adiwira Plastik
Peranan linear programming untuk memaksimumkan laba dalam produk mix pada PT. "X" di Gresik