Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan produktivitas produk D16D di assembly line A PT Astra Otoparts divisi Adiwira Plastik
Author
Sihanabun, Adrian
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021442/IND/2010
Subject(s)
PLANT LAYOUT
PRODUCTION MANAGEMENT
PRODUCTION PLANNING
INDUSTRIAL PRODUCTIVITY
Notes
Bibliography : p. 50
Abstract
-
Physical Dimension
Number of Page(s)
xi, 50 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03823/10
(T) 658.5 Sih P
-
Unavailable : Removed
Similar Collection
by author or subject
Penurunan total waktu dan line stop akibat abnormality pada proses dandori serta standarisasi kerja di area 1 dan 2 PT. Astra Otoparts Tbk. Divisi Adiwira Plastik
Operations management
Inventory management and production planning and scheduling
Usulan perbaikan sistem kerja dan perancangan fasilitas kerja dengan pendekatan ergonomi di PT Balifoam Nusa Megah
Pengurangan lead time produksi panel low voltage menggunakan material replenishment di PT. Schneider Indonesia
Perancangan tata letak lantai produksi di PT Mulia Jadi
Managing business process flows
Evaluasi efisiensi proses produksi sepatu Ardiles Kolonel di PT. Mitra Anugrah