Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa keseimbangan lintasan dengan mempertimbangkan studi gerakan pada lini perakitan 2 CV. Sinar Baja Electric
Author
Popy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011209/IND/2007
Subject(s)
PRODUCTION PLANNING
TIME MEASUREMENT
Notes
Appendix: p. 68 - 240
Bibliography: p. 67
Abstract
-
Physical Dimension
Number of Page(s)
x, 240 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02995/07
(T) - 658.5 Pop A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan produksi dan kebutuhan bahan baku di cv 'X'
Perencanaan kebutuhan bahan baku dan pemilihan supplier di PT. Indonesia multi Colour Printing
Penentuan perencanaan produksi baki dengan metode programa linier untuk mendapatkan ongkos produksi yang minimum pada PT "X" di Surabaya
Perancangan sistem PPIC (production planning, inventory and control) produk flusher di PT. Surya Indomental Semesta
Perancangan sistem departemen PPC cat di PT. Interkraft
The lean design guidebook
LKP : PT Sumber Djaja Perkasa Surabaya
Analisa pengukuran kerja dan penjadwalan di PT. E-T-E Indonesia