Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa keseimbangan lintasan dengan mempertimbangkan studi gerakan pada lini perakitan 2 CV. Sinar Baja Electric
Author
Popy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011209/IND/2007
Subject(s)
PRODUCTION PLANNING
TIME MEASUREMENT
Notes
Appendix: p. 68 - 240
Bibliography: p. 67
Abstract
-
Physical Dimension
Number of Page(s)
x, 240 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02995/07
(T) - 658.5 Pop A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Cellular manufacturing one-piece flow for workteams
Perencanaan dan pengendalian produksi di PT. Sabda Panca Elektronik
Perencanaan produksi perusahaan sepeda
Analisis produktivitas hollowframe di PT. Mulcindo
Upaya penurunan tingkat keterlambatan pemenuhan permintaan di PT. 'X'
Penjadualan produksi ubin keramik single firing di PT Asia Victory Industri Ltd.
Analisa kinerja manufacturing resource planning (MRP II) untuk produk filamen dan anchor di PT. Cahaya Angkasa Abadi
Perancangan sistem penjadwalan flexible flow line dengan ultimate buffers and setup di PT. Kerta Rajasa