Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa keseimbangan lintasan dengan mempertimbangkan studi gerakan pada lini perakitan 2 CV. Sinar Baja Electric
Author
Popy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011209/IND/2007
Subject(s)
PRODUCTION PLANNING
TIME MEASUREMENT
Notes
Appendix: p. 68 - 240
Bibliography: p. 67
Abstract
-
Physical Dimension
Number of Page(s)
x, 240 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02995/07
(T) - 658.5 Pop A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
How to implement lean manufacturing
Peningkatan produktivitas produk D16D di assembly line A PT Astra Otoparts divisi Adiwira Plastik
Perancangan pengukuran kinerja dengan pendekatan Malcolm Baldrige National Quality Award (MBNQA) modifikasi di PT Lestari Karya Makmur Surabaya
Perbaikan inventory dan penjadwalan produksi untuk memenuhi demand di CV. Sukses Bersama Sejahtera
Pengukuran, pengevaluasian, dan perencanaan perbaikan produktivitas di PT. Multiplast Jaya Tatamandiri
Perbaikan sistem dokumentasi pada departemen quality assurance di PT FSCM Manufacturing Indonesia Plant 4
Perancangan sistem suplai tanpa penambahan tempat di PT Toyota Motor Manufacturing Indonesia (PT TMMIN)
Upaya meminimasi bottle-neck di lini produksi PT. Halimjaya Sakti dengan pendekatan simulasi