Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa pengukuran kerja dan penjadwalan di PT. E-T-E Indonesia
Author
Caroline, Anita
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0681/IND/2003
Subject(s)
PRODUCTION PLANNING
PRODUCTION SCHEDULING
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 140 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00767/04
(T) 658.5 Car A
-
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh organizational culture terhadap entrepreneurial intensity dan supply chain integration dalam rangka memperoleh competitive advantage pada perusahaan jasa keuangan di Surabaya
Perancangan keseimbangan lintasan produksi pada perusahaan koper
Analisa pengaruh pengggunaan benchmarking terhadap keunggulan bersaing dan kinerja perusahaan
LKP : penjadwalan kerja di PT Surya Tedjakusuma
Penjadwalan tenaga paramedis perawatan di rumah sakit katolik st. vincentius a. paulo dengan bayesian optimization algorithm
Perancangan layout departemen produksi rokok SKT dan rokok SKM di P.T Gentong Gotri dengan algoritma kriteria ganda
Penjadwalan sepatu boot berkaitan dengan ukuran dan warna di PT. Toboyo
Perencanaan fasilitas dan sistem kerja dengan pendekatan ergonomi pada bagian pengebalan di departemen SKT Rungkut-2 PT "X"