Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa pengukuran kerja dan penjadwalan di PT. E-T-E Indonesia
Author
Caroline, Anita
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0681/IND/2003
Subject(s)
PRODUCTION PLANNING
PRODUCTION SCHEDULING
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 140 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00767/04
(T) 658.5 Car A
-
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh organizational culture terhadap entrepreneurial intensity dan supply chain integration dalam rangka memperoleh competitive advantage pada perusahaan jasa keuangan di Surabaya
Rancangan perencanaan produksi dan penjadwalan steel pipe industry of Indonesia
Perancangan sampling penerimaan atribut untuk bahan baku di PT. Agrindo
LKP : PT Almicos Surabaya
Penentuan kebutuhan jumlah tenaga kerja pada departemen MPC di PT. XYZ
Perancangan pengukuran kinerja bank 'X' dengan menggunakan kriteria malcolm baldrige national quality award
Perencanaan kebutuhan bahan baku di PT. Trijaya
How to implement lean manufacturing