Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa pengukuran kerja dan penjadwalan di PT. E-T-E Indonesia
Author
Caroline, Anita
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0681/IND/2003
Subject(s)
PRODUCTION PLANNING
PRODUCTION SCHEDULING
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 140 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00767/04
(T) 658.5 Car A
-
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh organizational culture terhadap entrepreneurial intensity dan supply chain integration dalam rangka memperoleh competitive advantage pada perusahaan jasa keuangan di Surabaya
Upaya penurunan lembur departemen part, apparel, dan accessoris (PAA) di CV. Roda Lintas Khatulistiwa
Kombinasi algoritma genetik & data envelopment analysis pada permasalahan penjadwalan flowshop dengan multi criteria
Pengukuran, evaluasi dan perencanaan peningkatan produktivitas pada PT. "X"
Perancangan sistem perencanaan produksi dan pengendalian bahan baku di PT Gunungarta Manunggal
Penerapan petri nets pada perancangan jangka pendek dan inisialisasi penjadwalan produksi di PT. Iga Abadi
Analisa perencanaan persediaan di PT. Surya Kertas
Improvement proses, screwing pada lini kaleng kopi di PT. Sinar Djaja Can