Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan produksi di cv sujaru.
Author
Mulyawan, Ferdy Kristianto
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0798/IND/2004
Subject(s)
PRODUCTION PLANNING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 169 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00860/04
(T) 658.5 Mul P
-
Unavailable : Removed
Similar Collection
by author or subject
Peramalan kebutuhan supporting material di PT. Agip Lubrindo Pratama
Optimalisasi kapasitas untuk memenuhi perencanaan produksi di PT X
Pengendalian persediaan di distributor hasil
Analisa keseimbangan lintasan dengan mempertimbangkan studi gerakan pada lini perakitan 2 CV. Sinar Baja Electric
The User's journey
Penjadwalan produksi untuk meminimumkan setup time dan memaksimumkan aliran uang dengan metode genetic algorithm studi kasus pada CV. WP
Implementasi module sales and distribution (sd) enterprice resource planning (erp) dengan mfg pro ver eb2 (qad) di unit cabang jakarta 1 dan service station jakarta 1 pt. akari indonesia
Algoritma heuristik HFC untuk penjadwalan flowshop tanpa mempertahankan karakteristik permutation