Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi perbandingan algoritma heuristik hamid dan mip untuk meminimumkan makespan pada penjadualan flowshop
Author
Munika, Ika
Additional Author(s)
Palembangan, Aris
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0687/IND/2003
Subject(s)
PRODUCTION SCHEDULING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 82 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01150/04
(T) 658.53 Mun S
-
Unavailable : Removed
Similar Collection
by author or subject
Speed to market
Construction project scheduling and control
Penjadwalan produksi dengan menggunakan pendekatan algoritma genetika, algoritma heuristic rajendran, dan algoritma heuristic ho dan chang di PT. Bintang Adyapastikaglass
Kombinasi algoritma genetik & data envelopment analysis pada permasalahan penjadwalan flowshop dengan multi criteria
Construction scheduling
Construction planning and scheduling
Perancangan sistem perencanaan dan penjadwalan produksi di PT. Bondi Syad Mulia
Perancangan sistem perencanaan dan penjadwalan produksi di cv. Toyobo