Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Construction scheduling with primavera project planner 2nd ed
Author
Feigenbaum, Leslie
Additional Author(s)
-
Publisher
Upper Saddle River, N.J.: 2002
Language
English
ISBN
0130922013
Series
-
Subject(s)
BUILDING-SUPERINTENDENCE
CONSTRUCTION INDUSTRY-MANAGEMENT
PRIMAVERA PROJECT PLANNER
PRODUCTION SCHEDULING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 340 p.
Dimension
28 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00146/04
Res 690.068 Fee C
Library - 8th Floor
Available
Similar Collection
by author or subject
Sistem manajemen konstruksi
Value engineering in construction management
Pre-contract practice
Faktor-faktor yang mempengaruhi harga perumahan skala kecil di Surabaya dan sekitarnya
Analisa faktor-faktor yang mempengaruhi strategi perusahaan yang berdampak pada penetapan harga produk realestate di Surabaya
Studi tentang faktor-faktor yang mempengaruhi besarnya mark-up pada kontraktor ruko dan perumahan di Surabaya
Proporsi komponen biaya harga bahan, upah, dan alat pada proyek konstruksi bangunan tinggi
Usulan perancangan sistem informasi manajemen pengendalian mutu pekerjaan beton konvensional di perusahaan jasa konstruksi