Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Construction scheduling with primavera project planner 2nd ed
Author
Feigenbaum, Leslie
Additional Author(s)
-
Publisher
Upper Saddle River, N.J.: 2002
Language
English
ISBN
0130922013
Series
-
Subject(s)
BUILDING-SUPERINTENDENCE
CONSTRUCTION INDUSTRY-MANAGEMENT
PRIMAVERA PROJECT PLANNER
PRODUCTION SCHEDULING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 340 p.
Dimension
28 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00146/04
Res 690.068 Fee C
Library - 8th Floor
Available
Similar Collection
by author or subject
Gambaran umum training pada site engineering manager kontraktor BUMN di Surabaya
Last planner system terhadap performa proyek konstruksi
Pengaruh dilatasi pada bangunan dengan ketidakberaturan sudut dalam yang didesain secara direct displacement based
Studi mengenai penerapan manajemen risiko oleh perusahaan kontraktor di Surabaya
Management development
Identifikasi dan alokasi risiko-risiko pada proyek jembatan nasional Suramadu
Pembuatan model assessment untuk identifikasi delapan pemborosan di bidang industri konstruksi
Analisa studi perbandingan antara rumah toko dengan kombinasi rumah toko-stand ditinjau dari aspek pemasaran dan finansial pada proyek gateway, Sidoarjo