Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Construction scheduling with primavera project planner 2nd ed
Author
Feigenbaum, Leslie
Additional Author(s)
-
Publisher
Upper Saddle River, N.J.: 2002
Language
English
ISBN
0130922013
Series
-
Subject(s)
BUILDING-SUPERINTENDENCE
CONSTRUCTION INDUSTRY-MANAGEMENT
PRIMAVERA PROJECT PLANNER
PRODUCTION SCHEDULING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 340 p.
Dimension
28 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00146/04
Res 690.068 Fee C
Library - 8th Floor
Available
Similar Collection
by author or subject
Perbandingan tingkat kepentingan dan kepuasan antara insentif finansial dan insentif non-finansial bagi staf karyawan lapangan dan kantor
Analisa faktor-faktor positioning perusahaan kontraktor kelas B (besar) di Surabaya
Survei tingkat kepentingan dan penerapan sumber dan siklus material dari greenship rating tools pada proyek konstruksi
Project evaluation and procurement case studies
Prediksi kinerja waktu proyek konstruksi
Analisa konfik dalam perusahaan kontraktor
Risiko dan penanganannya pada proyek konstruksi: studi kasus pada proyek gedung dan infrastruktur
Studi tentang project closeout pada proyek gedung T (gedung kuliah dan poliklinik) Universitas Kristen Petra