Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Construction scheduling with primavera project planner 2nd ed
Author
Feigenbaum, Leslie
Additional Author(s)
-
Publisher
Upper Saddle River, N.J.: 2002
Language
English
ISBN
0130922013
Series
-
Subject(s)
BUILDING-SUPERINTENDENCE
CONSTRUCTION INDUSTRY-MANAGEMENT
PRIMAVERA PROJECT PLANNER
PRODUCTION SCHEDULING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 340 p.
Dimension
28 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00146/04
Res 690.068 Fee C
Library - 8th Floor
Available
Similar Collection
by author or subject
Kontrol material pada proyek konstruksi perumahan
Model pengukuran tingkat motivasi dan demotivasi staf teknik perusahaan kontraktor di Surabaya
Infrastructure for the built environment
Studi faktor-faktor penyebab change order pada proyek konstruksi di Surabaya yang menggunakan kontrak traditional serta design-build
Prefabrication dan modular construction serta pengaruh precast terhadap scheduling proyek
Analisa pelaksanaan time management proyek konstruksi pada perusahaan kontraktor di Surabaya
Analisis prioritas kekritisan rework dan penyebabnya yang terjadi pada suatu proyek sekolah dengan menggunakan metode Failure Modes and Effects Analysis (FMEA)
Perbandingan komposisi pekerja pasangan dinding bata antara SNI 2008 dengan kenyataan di lapangan...