Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan komposisi pekerja pasangan dinding bata antara SNI 2008 dengan kenyataan di lapangan...
Author
Tjahjadi, Stanislaus
Additional Author(s)
Christian, Yonathan Hans
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011908/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 32-44
. Bibliography: p. 31 .
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 44 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02616/13
(T) 690.068 Tja P
-
Unavailable : Removed
Similar Collection
by author or subject
Hubungan antara time overruns dan kepuasan konsumen menurut pendapat kontraktor dan pengembang pada proyek perumahan
Penentuan produktivitas pekerja sebagai dasar penentuan upah (studi kasus pada proyek perkantoran)
Analisis pengaruh variabel lokasi, produk, harga, promosi, pelayanan dan desain terhadap minat konsumen factory outlet di Surabaya
Studi literatur upaya penggunaan barcode di industri konstruksi
Perhitungan produktivitas tenaga kerja pada pekerjaan pembesian dengan metode level of effort (studi kasus pada proyek X dan Y)
Evaluasi apartemen High Point dari aspek finansial
Model simulasi um-cyclone pada operasional perusahaan beton siap pakai (studi kasus PT. Jatim Readymix)
Analisis produktivitas jam normal dan jam lembur pada pekerjaan struktur beton bertulang