Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Marine works with cost estimation for ashkelon desalination project
Author
Polisar, Ivandy
Additional Author(s)
Wicaksono, Andreas
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1268/SIP/2003
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 165 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03648/03
(T) 692.5 Pol M
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
Analisa aspek-aspek dalam prosedur change order pada proyek konstruksi
Analisis kepuasan penghuni perumahan Pondok Tjandra Indah
Peranan konsultan manajemen konstruksi terhadap tingkat kemandirian masyarakat pada proyek P2MPD di Kabupaten Jember
Model simulasi um-cyclone pada operasional perusahaan beton siap pakai (studi kasus PT. Jatim Readymix)
Etika bisnis konstruksi
Construction superintendent's operations manual
Proporsi biaya tiap satuan pekerjaan struktur beton bertulang proyek konstruksi bangunan tinggi
Manajemen risiko pada kecelakaan kerja di proyek konstruksi