Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Marine works with cost estimation for ashkelon desalination project
Author
Polisar, Ivandy
Additional Author(s)
Wicaksono, Andreas
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1268/SIP/2003
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 165 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03648/03
(T) 692.5 Pol M
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
Evaluasi sistem pengendalian biaya proyek pada perusahaan jasa konstruksi berskala besar di Surabaya
Analisa biaya konstruksi berdasarkan SNI 2008 dan aplikasinya
Identifikasi dan penanganan keterlambatan pekerjaan struktur dan finishing pada proyek sekolah 'X'
Gambaran umum training pada site engineering manager kontraktor BUMN di Surabaya
Pengukuran produktivitas pekerjaan dinding hebel studi kasus pada proyek apartemen x
Construction estimating and job preplanning
Perkreditan kontraktor kualifikasi kecil
Skedul kebutuhan sumber daya pada proyek sekolah dengan menggunakan program primavera