Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Marine works with cost estimation for ashkelon desalination project
Author
Polisar, Ivandy
Additional Author(s)
Wicaksono, Andreas
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1268/SIP/2003
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 165 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03648/03
(T) 692.5 Pol M
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
Analisis dampak negatif pelaksanaan pembangunan proyek terhadap lingkungan hidpu di sekitarnya
Inspeksi pelaksanaan bekisting pada proyek konstruksi X
Monitoring jadwal suatu proyek sekolah dengan menggunakan metode SPI dan PPC
Studi awal supply chain management pada kontraktor-kontraktor di Surabaya
Mengenal klaim konstruksi dan penyelesaian sengketa konstruksi
Potensi penerapan lean construction pada proyek konstruksi di Surabaya
Construction equipment policy
Studi tentang faktor-faktor yang mempengaruhi perencanaan site layout proyek konstruksi di Surabaya