Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Marine works with cost estimation for ashkelon desalination project
Author
Polisar, Ivandy
Additional Author(s)
Wicaksono, Andreas
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1268/SIP/2003
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 165 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03648/03
(T) 692.5 Pol M
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
Rencana dan estimate real of cost
Studi kasus tentang aspek-aspek pemancangan pada proyek metropolis apartment-Surabaya
Analisa kepuasan pengembang terhadap kualitas konstruksi pada perumahan kelas menengah di Surabaya
Proporsi komponen biaya harga bahan, upah, dan alat pada proyek konstruksi bangunan tinggi
Principles of construction management
Analisa pengaruh elemen lansekap terhadap nilai properti berdasarkan persepsi penghuni di kawasan perumahan Surabaya Timur dan Surabaya Barat
Perhitungan produktivitas tenaga kerja pekerjaan bekisting dengan metode level of effort
Impacts of managerial and operational problems on facility layout arrangement in multi products precasting yards