Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Marine works with cost estimation for ashkelon desalination project
Author
Polisar, Ivandy
Additional Author(s)
Wicaksono, Andreas
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1268/SIP/2003
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 165 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03648/03
(T) 692.5 Pol M
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
LKP : gedung Kampus ITATS
Perbandingan aplikasi progam Microsoft Project dan Primavera dalam penjadwalan proyek konstruksi
Pemakaian indeks dan kompensasi akibat inflasi pada perusahaan konstruksi
Faktor resiko yang kritis pada proyek water supply dan power plant dengan pola bot di Indonesia
Analisa faktor-faktor positioning perusahaan kontraktor kelas B (besar) di Surabaya
Studi literatur tentang berbagai macam sertifikasi di dunia konstruksi
Perubahan harga BBM terhadap biaya konstruksi rumah sehat sederhana (RSH)
Perbandingan kinerja bangunan yang didesain dengan force-based design dan direct displacement-based design menggunakan SNI gempa 2012