Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Marine works with cost estimation for ashkelon desalination project
Author
Polisar, Ivandy
Additional Author(s)
Wicaksono, Andreas
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1268/SIP/2003
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 165 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03648/03
(T) 692.5 Pol M
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
Rasio kebutuhan beton, besi tulangan, dan bekisting untuk pekerjaan struktur pada proyek apartemen dan hotel
Produktivitas pengecoran beton ready-mixed dengan concrete pump dan tower crane (Studi Kasus: Proyek Ciputra World Surabaya)
Analisa dampak kenaikan harga BBM terhadap biaya konstruksi
Perbandingan tingkat kepentingan dan kepuasan antara insentif finansial dan insentif non-finansial bagi staf karyawan lapangan dan kantor
Jenis pekerjaan yang mendominasi komposisi biaya pembangunan ruko
Pandangan konsultan perencana mengenai kualitas dokumen desain dan faktor-faktor yang mempengaruhinya
Simplified guide to construction management for architects and engineers
Kajian awal mengenai peformance intensity (momentum management) untuk mengukur kinerja waktu proyek konstruksi