Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Proporsi komponen biaya harga bahan, upah, dan alat pada proyek konstruksi bangunan tinggi
Author
Halim, Cristian
Additional Author(s)
Maria S.D., Maximillian
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012043/SIP/2015
Subject(s)
CONSTRUCTION INDUSTRY-COSTS
REINFORCED CONCRETE STRUCTURES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 160.
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 160 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02645/15
(T) SIP 2043
-
Unavailable : Removed
Similar Collection
by author or subject
Menghitung umur penggantian berat yang optimum dengan biaya daur kehidupan yang minimum
Analisa CPM dan bar-chart dengan menggunakan program microsoft project (Studi kasus bangunan kampus ITN 4 lantai di Malang)
Identifikasi dan penanganan keterlambatan pekerjaan struktur dan finishing pada proyek sekolah 'X'
Pengaruh kinerja keuangan dan faktor makro ekonomi terhadap return saham perusahaan properti di bursa efek Jakarta
Identifikasi faktor-faktor penentu dalam pengadaan dan pemilihan Ruko di Surabaya
Analisis produktivitas jam normal dan jam lembur pada pekerjaan struktur beton bertulang
Manajemen proyek konstruksi
Evaluasi unsafe act dan unsafe condition pada suatu proyek