Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Proporsi komponen biaya harga bahan, upah, dan alat pada proyek konstruksi bangunan tinggi
Author
Halim, Cristian
Additional Author(s)
Maria S.D., Maximillian
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012043/SIP/2015
Subject(s)
CONSTRUCTION INDUSTRY-COSTS
REINFORCED CONCRETE STRUCTURES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 160.
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 160 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02645/15
(T) SIP 2043
-
Unavailable : Removed
Similar Collection
by author or subject
Perbandingan tingkat kepentingan dan kepuasan antara insentif finansial dan insentif non-finansial bagi staf karyawan lapangan dan kantor
Approximate cost estimate berdasarkan kandungan besi dan kebutuhan bekisting pada struktur beton bertulang bangunan ruko (SOHO)
Manajemen konstruksi
Penelitian awal tentang sisa material konstruksi pada perusahaan kontraktor di Surabaya
Model pengukuran tingkat motivasi dan demotivasi staf teknik perusahaan konsultan di Surabaya
Analisis biaya dan kemungkinan investasi rumah tipe di Citra Raya dan Wisata Bukit Mas
Pengaruh beberapa faktor budaya Bali terhadap motivasi kerja pekerja konstruksi, dan perbedaannya pada beberapa proyek di Denpasar
Analisis pengaruh variabel sikap, keahlian dan pengetahuan terhadap kompentensi manajemen perusahaan konstruksi dari sudut pandang owner, konsultan dan sub kontraktor...