Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Proporsi komponen biaya harga bahan, upah, dan alat pada proyek konstruksi bangunan tinggi
Author
Halim, Cristian
Additional Author(s)
Maria S.D., Maximillian
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012043/SIP/2015
Subject(s)
CONSTRUCTION INDUSTRY-COSTS
REINFORCED CONCRETE STRUCTURES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 160.
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 160 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02645/15
(T) SIP 2043
-
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh tindakan tidak aman (unsafe act) dan kondisi tidak aman (unsafe condition) terhadap kecelakaan kerja konstruksi
Analisis kinerja waktu proyek sekolah "X" dengan metode performance intensity
Pandangan konsultan perencana terhadap design rework dan aktivitas menunggu pada pekerjaan desain
Perencanaan dan penjadwalan sumber daya manusia pada proyek konstruksi dengan program primavera
Sistem perencanaan dan penjadwalan linear untuk proyek bangunan industri pergudangan
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Case study of cost estimation procedure and development methods in RHDHV Indonesia
Studi kasus terjadinya cacat konstruksi dengan pendekatan human error pada proyek gedung bertingkat