Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Proporsi komponen biaya harga bahan, upah, dan alat pada proyek konstruksi bangunan tinggi
Author
Halim, Cristian
Additional Author(s)
Maria S.D., Maximillian
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012043/SIP/2015
Subject(s)
CONSTRUCTION INDUSTRY-COSTS
REINFORCED CONCRETE STRUCTURES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 160.
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 160 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02645/15
(T) SIP 2043
-
Unavailable : Removed
Similar Collection
by author or subject
Studi harga satuan upah untuk proyek bangunan tinggi
Studi kasus pengukuran produktivitas pekerjaan pemancangan pada proyek x dan faktor-faktor yang mempengaruhinya
Construction scheduling
Usulan implementasi sistem umpan balik360 derajat di perusahaaan konstruksi X
Construction extension to the PMBOK guide third edition
Faktor demotivasi pekerja dan dampaknya pada beberapa proyek konstruksi di Surabaya
Analisa sensitifitas penetapan harga proyek "X" dengan model fair and reasonable markup (FARM)
Construction management