Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Proporsi komponen biaya harga bahan, upah, dan alat pada proyek konstruksi bangunan tinggi
Author
Halim, Cristian
Additional Author(s)
Maria S.D., Maximillian
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012043/SIP/2015
Subject(s)
CONSTRUCTION INDUSTRY-COSTS
REINFORCED CONCRETE STRUCTURES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 160.
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 160 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02645/15
(T) SIP 2043
-
Unavailable : Removed
Similar Collection
by author or subject
Penentuan produktivitas pekerja sebagai dasar penentuan upah (studi kasus pada proyek perkantoran)
Optimasi site layout pada proyek konstruksi caspian tower dengan menggunakan metode metaheuristik berdasarkan traveling distance pekerja
Prediksi kinerja waktu proyek konstruksi
Evaluasi produktivitas kerja struktur kolom, balok dan plat di proyek Tunjungan Plaza 6
Manajemen konstruksi
Pengaruh kualitas layanan purna jual terhadap kepuasan dan loyalitas konsumen rumah menengah atas di Surabaya
Analisa dampak kenaikan harga BBM terhadap biaya konstruksi
Pengembangan elemen discrete kirchhoff midlin quadrilateral (DKMQ) untuk analisis pelat lipat komposit