Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Hubungan overtime dengan produktivitas pekerjaan pembesian (studi kasus pada proyek x, y, dan z)
Author
Santoso, Guntur Budi
Additional Author(s)
Chandra, Januar
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121487/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix: p. 76 - 373
Bibliography: p. 75
Abstract
-
Physical Dimension
Number of Page(s)
xix, 373 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05704/06
(T) - 690.068 San H
-
Unavailable : Removed
Similar Collection
by author or subject
Information methods
Perencanaan elemen struktur baja berdasarkan SNI 1729 : 2015
Permodelan penjadwalan linier dengan alokasi sumber daya manusia pada proyek perumahan
Studi tentang manajemen risiko dalam bidang manajemen konstruksi
Pengaruh penggunaan kombinasi viscosity modifying admixtures dan superplasticizer terhadap rheologi mortar dan beton self compacting concrete
Manajemen proyek konstruksi
Studi tentang project closeout pada proyek gedung T (gedung kuliah dan poliklinik) Universitas Kristen Petra
Marine works with cost estimation for ashkelon desalination project