Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Hubungan overtime dengan produktivitas pekerjaan pembesian (studi kasus pada proyek x, y, dan z)
Author
Santoso, Guntur Budi
Additional Author(s)
Chandra, Januar
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121487/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix: p. 76 - 373
Bibliography: p. 75
Abstract
-
Physical Dimension
Number of Page(s)
xix, 373 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05704/06
(T) - 690.068 San H
-
Unavailable : Removed
Similar Collection
by author or subject
Evaluasi sistem estimasi biaya proyek pada perusahaan kontraktor di surabaya
Faktor demotivasi staf profesional pada perusahaan kontraktor di Surabaya
Faktor-faktor manusia yang mempengaruhi penolakan SDM dalam menjalankan sistem informasi berbasis teknologi informasi (studi pada SDM perusahaan konstruksi di Surabaya)
Analisa faktor-faktor yang mempengaruhi perencanaan durasi aktifitas dalam proyek koonstruksi
Marine works with cost estimation for ashkelon desalination project
Studi tentang kepercayaan pengembang perumahan kepada kontraktor
Studi mengenai faktor-faktor penyebab rework pada proyek-proyek di Surabaya
Analisa life cycle cost pada gedung manajemen perhotelan Universitas Kristen Petra