Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Hubungan overtime dengan produktivitas pekerjaan pembesian (studi kasus pada proyek x, y, dan z)
Author
Santoso, Guntur Budi
Additional Author(s)
Chandra, Januar
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121487/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix: p. 76 - 373
Bibliography: p. 75
Abstract
-
Physical Dimension
Number of Page(s)
xix, 373 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05704/06
(T) - 690.068 San H
-
Unavailable : Removed
Similar Collection
by author or subject
Sistem optimalisasi penjadwalan linear scheduling method pada proyek saluran irigasi
Sistem manajemen informasi arus kas secara terpusat (studi kasus pada PT. X )
Project management
Sistem informasi manajemen untuk pengendalian biaya proyek PT. "ABC" pada proyek "X"
Approximate cost estimate berdasarkan kandungan besi dan kebutuhan bekisting pada struktur beton bertulang bangunan tinggi
Penanganan sisa material ready-mixed concrete pada proyek konstruksi
Studi tentang komunikasi verbal dalam project launch meeting
Project evaluation and procurement case studies