Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi mengenai faktor-faktor penyebab rework pada proyek-proyek di Surabaya
Author
Hendarlim, Yanto
Additional Author(s)
Winata, Dyonisius Samuel
Publisher
Surabaya: 2004
Language
Chinese
ISBN
-
Series
Tugas Akhir No. 1318/SIP/2004
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
x, 67 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01533/04
(T) 690.068 Hen S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perhitungan percent plan completed dan identifikasi faktor tidak tercapainya rencana pekerjaan pada.
Inspeksi pelaksanaan bekisting pada proyek konstruksi X
The Characteristics of innovative construction project: a study in Thailand construction industry
Analisa produktivitas pekerjaan pemancangan dan faktor-faktor yang mempengaruhinya dengan metode MPDM pada proyek X di Surabaya
Monitoring dan analisis jadwal proyek menggunakan metode performance intensity dan CPM pada proyek hotel
Industri konstruksi dan organisasi proyek
Model pengendalian biaya dan resiko (pada perumahan graha famili, Surabaya)
Model matematis hubungan kinerja konsultan dan komunikasi dalam proyek konstruksi