Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor demotivasi staf profesional pada perusahaan kontraktor di Surabaya
Author
Abadi, Yonathan Kusuma
Additional Author(s)
Dermawan, Rudy
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.12301518/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
MOTIVATION IN MANAGEMENT
Notes
Appendix: p. 44 - 54
Bibliography: p. 42 - 43
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 54 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00762/07
(T) - 658.314 Aba F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi kasus perbandingan berbagai bata ringan dari segi material biaya, dan produktivitas
Model sumber dan penyebab rework pada tahapan proyek konstruksi
Studi tentang komponen-komponen yang terdapat dalam tahapan-tahapan pengembangan perumahan oleh PT."X" di makassar
Prefabrication dan modular construction serta pengaruh precast terhadap scheduling proyek
Pengaruh latar belakang dan karakter anggota lending group usaha mikro terhadap motivasi usaha, kognisi usaha, dan daya inventif anggotanya di wilayah Surabaya/Sidoarjo
Analisa dependensi antara gaya kepemimpinan dan motivasi kerja dengan kinerja karyawan pada PT. Atlantic Biruraya
Perbandingan sistem tunggal dan sistem ganda struktur baja rangka terbreis konsentris khusus berbentuk V terbalik dengan direct analysis method
Principles of construction management