Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor demotivasi staf profesional pada perusahaan kontraktor di Surabaya
Author
Abadi, Yonathan Kusuma
Additional Author(s)
Dermawan, Rudy
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.12301518/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
MOTIVATION IN MANAGEMENT
Notes
Appendix: p. 44 - 54
Bibliography: p. 42 - 43
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 54 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00762/07
(T) - 658.314 Aba F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Harapan dan realita sistem manajemen mutu ISO 9000 dalam penerapannya di perusahaan kontraktor
The impact of value engineering in the design and construction process
Diskriminasi terhadap karier wanita dalam perusahaan kontraktor
Studi tentang inovasi teknologi alat berat dalam industri konstruksi
Perbandingan kinerja bangunan yang didesain dengan force-based design dan direct displacement-based design menggunakan SNI gempa 2012
Sistem jaminan kualitas dan biaya kualitas pada proyek tangki elpiji
Studi literatur tentang constructability dalam proyek konstruksi
Perancangan sistem informasi manajemen proses tender pada proyek konstruksi (studi kasus di PT."X")