Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor demotivasi staf profesional pada perusahaan kontraktor di Surabaya
Author
Abadi, Yonathan Kusuma
Additional Author(s)
Dermawan, Rudy
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.12301518/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
MOTIVATION IN MANAGEMENT
Notes
Appendix: p. 44 - 54
Bibliography: p. 42 - 43
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 54 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00762/07
(T) - 658.314 Aba F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Model sistem informasi manajemen dalam pengendalian jadwal proyek
Faktor-faktor yang berperanan dalam penentuan kompensasi pekerja bangunan pada peusahaan kontraktor kelas A di Surabaya yang bergerak di bidang pembangunan gedung
Theory of constraints dalam manajemen konstruksi khususnya di bidang pelaksanaan pembangunan perumahan di Surabaya
Analisis sumber daya manusia untuk perencanaan jadwal CPM pada proyek ruko
Toekomst van de kantorenmarkt 1994-2015
Strategi sumber daya manusia untuk pekerja konstruksi (staf teknik)
Sistem optimalisasi penjadwalan linear scheduling method pada proyek saluran irigasi
Pengaruh gaya kepemimpinan transformasional dan komitmen organisasional terhadap kinerja karyawan pada PT. Aneka Cipta Total Solusindo