Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Impacts of managerial and operational problems on facility layout arrangement in multi products precasting yards
Author
Benu, Maria Irene Beatry
Additional Author(s)
-
Publisher
Thailand: 2002
Language
English
ISBN
-
Series
Tugas Akhir Thesis No. ST-02-36
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vi, 107 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01295/03
T2 690.068 Ben I
-
Available
2.
01294/03
T2 690.068 Ben I
-
Available
Similar Collection
by author or subject
Perencanaan dan pengendalian biaya dan waktu pada suatu proyek konstruksi menggunakan program CCoBMLSE
Tingkat kepentingan dan tingkat kepuasan dari faktor-faktor motivasi pekerja konstruksi
Studi mekanisme kecelakaan kerja berdasarkan system approach to human error
Analisis faktor-faktor yang mempengaruhi perilaku konsumen dalam pembelian rumah menengah di Surabaya Barat
Studi kasus perbandingan biaya perancah kayu, gelam dan besi pada proyek ruko di Surabaya
Proporsi biaya tiap satuan pekerjaan struktur beton bertulang proyek konstruksi bangunan tinggi
Evaluasi kinerja bangunan dengan ketidakberaturan sudut dalam yang direncanakan secara direct displacement based design
Model faktor-faktor penyebab dan dampak keterlambatan proyek konstruksi di Surabaya