Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Impacts of managerial and operational problems on facility layout arrangement in multi products precasting yards
Author
Benu, Maria Irene Beatry
Additional Author(s)
-
Publisher
Thailand: 2002
Language
English
ISBN
-
Series
Tugas Akhir Thesis No. ST-02-36
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vi, 107 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01295/03
T2 690.068 Ben I
-
Available
2.
01294/03
T2 690.068 Ben I
-
Available
Similar Collection
by author or subject
Studi tentang faktor-faktor yang menentukan besarnya mark up dalam penerapan teori utilitias pada penawaran konstruksi fisik di Surabaya
Perhitungan produktivitas tenaga kerja pada pekerjaan pembesian dengan metode level of effort (studi kasus pada proyek X dan Y)
Tantangan dan hambatan penerapan konsep "Sustainable Construction" pada kontraktor perumahan di Surabaya
Analisa CPM dan bar-chart dengan menggunakan program microsoft project (Studi kasus bangunan kampus ITN 4 lantai di Malang)
Analisis faktor penyebab keterlambatan pada bangunan tinggi di Surabaya
Analisis unsafe act dan unsafe condition pada proyek pembangunan gedung x
Faktor-faktor yang mempengaruhi pemeliharaan ditinjau dari pengorganisasian tenaga kerja dan biaya pemeliharaan apartemen dan kondominium
Studi kasus harga satuan upah dan bahan beton bertulang untuk proyek bangunan satu lantai