Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Impacts of managerial and operational problems on facility layout arrangement in multi products precasting yards
Author
Benu, Maria Irene Beatry
Additional Author(s)
-
Publisher
Thailand: 2002
Language
English
ISBN
-
Series
Tugas Akhir Thesis No. ST-02-36
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vi, 107 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01295/03
T2 690.068 Ben I
-
Available
2.
01294/03
T2 690.068 Ben I
-
Available
Similar Collection
by author or subject
Analisis faktor-faktor yang dipertimbangkan konsumen dalam memilih lokasi perumahan menengah di Denpasar dan Kabupaten Badung, Bali
Program perhitungan efektivitas penggunaan tower crane pada bangunan bertingkat
Aplikasi material requirement planning untuk mengendalikan investasi pengadaan material pada PT. JHS Pilling System
Produktivitas pekerjaan beton bertulang untuk perhitungan harga satuan upah pekerjaan
Pandangan konsultan perencana mengenai kualitas dokumen desain dan faktor-faktor yang mempengaruhinya
Penggunaan penyelesaian sengketa pada proyek konstruksi
Studi tentang faktor-faktor yang mempengaruhi perencanaan site layout proyek konstruksi di Surabaya
Analisis faktor penyebab, usaha minimalisasi dan program perhitungan sisa material dinding