Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penyiapan bill of quantity untuk estimasi biaya pekerjaan konstruksi baja
Author
Hartanto, Andrie Wibowo
Additional Author(s)
Sie, William Leowanto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011553/SIP/2007
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 70 - 82
Bibliography: p. 69
Abstract
-
Physical Dimension
Number of Page(s)
xix, 82 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03716/07
(T) - 692.5 Har P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis bangunan menghitung anggaran biaya bangunan
Investment, procurement adn performance in construction
Construction scheduling
Faktor resiko yang kritis pada proyek water supply dan power plant dengan pola bot di Indonesia
Analisa dan evaluasi sisa material konstruksi pada proyek ciputra world Surabaya
Analisa pelaksanaan time management proyek konstruksi pada perusahaan kontraktor di Surabaya
Studi kasus tentang aspek-aspek pemancangan pada proyek metropolis apartment-Surabaya
Construction management