Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penyiapan bill of quantity untuk estimasi biaya pekerjaan konstruksi baja
Author
Hartanto, Andrie Wibowo
Additional Author(s)
Sie, William Leowanto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011553/SIP/2007
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 70 - 82
Bibliography: p. 69
Abstract
-
Physical Dimension
Number of Page(s)
xix, 82 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03716/07
(T) - 692.5 Har P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Usulan sistem pengendalian biaya proyek (studi kasus kontraktor a, b dan c di Surabaya)
Financial data analysis and income recognition pada perusahaan konstruksi
Perbandingan komposisi pekerja pasangan dinding bata antara SNI 2008 dengan kenyataan di lapangan...
Survei tingkat kepentingan dan penerapan sumber dan siklus material dari greenship rating tools pada proyek konstruksi
Penyiapan bill of quantity untuk estimasi biaya pekerjaan konstruksi
Pengujian elemen cangkang yang terdapat dalam program komersial dengan analisis geometri linier dan nonlinier
Analisis hubungan antara tingkat tindakan tidak aman dan keefektifan pekerja pada proyek
Faktor-faktor yang mempengaruhi pemeliharaan ditinjau dari pengorganisasian tenaga kerja dan biaya pemeliharaan apartemen dan kondominium