Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penyiapan bill of quantity untuk estimasi biaya pekerjaan konstruksi baja
Author
Hartanto, Andrie Wibowo
Additional Author(s)
Sie, William Leowanto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011553/SIP/2007
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 70 - 82
Bibliography: p. 69
Abstract
-
Physical Dimension
Number of Page(s)
xix, 82 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03716/07
(T) - 692.5 Har P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pandangan konsultan perencana terhadap design rework dan aktivitas menunggu pada pekerjaan desain
Studi kasus perencanaan alokasi kebutuhan tenaga kerja pada proyek konstruksi gedung kuliah dan poliklinik Universitas Kristen Petra
Analisa studi perbandingan antara rumah toko dengan kombinasi rumah toko-stand ditinjau dari aspek pemasaran dan finansial pada proyek gateway, Sidoarjo
Analisis unsafe act dan unsafe condition pada proyek pembangunan gedung x
Analisa faktor yang mempengaruhi tahapan investasi pengembang perumahan
Analisa CPM dan bar-chart dengan menggunakan program microsoft project (Studi kasus bangunan kampus ITN 4 lantai di Malang)
Analisis kepuasan penghuni perumahan Pondok Tjandra Indah
Penggunaan spreadsheet untuk pengendalian biaya pada proyek "rumah-toko"