Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penyiapan bill of quantity untuk estimasi biaya pekerjaan konstruksi
Author
Lusiana
Additional Author(s)
Prasetya, Erich Hudi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011545/SIP/2007
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 50 - 109
Bibliography: p. 49
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 109 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03710/07
(T) - 692.5 Lus P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa kinerja perusahaan sebelum dan sesudah kombinasi bisnis melalui perhitungan ROIC, WACC dan EVA pada perusahaan go public
Tingkat pengetahuan masyarakat Denpasar, Bali tentang program talk show "Ajeg Bali" Bali TV
Perancangan pengukuran kinerja bank 'X' dengan menggunakan kriteria malcolm baldrige national quality award
A study on Richard Steele's the conscious lovers as a sentimental comedy
Pengaruh penggunaan kombinasi viscosity modifying admixtures dan superplasticizer terhadap rheologi mortar dan beton self compacting concrete
Perkembangan sustainable construction di Indonesia dan potensi penerapannya pada tahap pelaksanaan
Tantangan yang berpengaruh dan keterampilan manajer proyek pada proyek bangunan hijau
Analisa (cara modern) anggaran biaya pelaksanaan