Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penyiapan bill of quantity untuk estimasi biaya pekerjaan konstruksi
Author
Lusiana
Additional Author(s)
Prasetya, Erich Hudi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011545/SIP/2007
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 50 - 109
Bibliography: p. 49
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 109 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03710/07
(T) - 692.5 Lus P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Tingkat pengetahuan masyarakat Denpasar, Bali tentang program talk show "Ajeg Bali" Bali TV
Analisa kinerja perusahaan sebelum dan sesudah kombinasi bisnis melalui perhitungan ROIC, WACC dan EVA pada perusahaan go public
Analisis preferensi calon pengantin terhadap wedding service di Surabaya
Studi komparasi member card dan non member terhadap frekuensi belanja, tingkat pembelian dan loyalitas konsumen di indogrosir surabaya
Penelitian awal tentang sisa material konstruksi pada perusahaan kontraktor di Surabaya
Perbandingan sistem tunggal dan sistem ganda struktur baja rangka terbreis konsentris khusus berbentuk V terbalik dengan direct analysis method
Hubungan overtime dengan produktivitas pekerjaan pembesian (studi kasus pada proyek x, y, dan z)
Analisa studi perbandingan antara rumah toko dengan kombinasi rumah toko-stand ditinjau dari aspek pemasaran dan finansial pada proyek gateway, Sidoarjo