Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Author
Robot, Decky
Additional Author(s)
Decky Robot
Publisher
Surabaya: 2002
Language
Indonesian
ISBN
-
Series
Tesis 055/MTS
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
CONSTRUCTION INDUSTRY-RESEARCH
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 202 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00178/03
(T2) 690.0683 Rob P
-
Unavailable : Lost
Similar Collection
by author or subject
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Penerapan program dinamis probabilistik pada manajemen proyek konstruksi
Perencanaan dan pengendalian jadwal proyek: studi kasus proyek X
Studi literatur tentang constructability dalam proyek konstruksi
Identifikasi faktor-faktor penentu dalam pengadaan dan pemilihan Ruko di Surabaya
Analisis waktu pekerjaan finishing pada proyek apartemen
Peranan teknologi robotik di proyek konstruksi
Analisa frekuensi dan penyebab change order pada proyek apartemen di Surabaya