Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Author
Robot, Decky
Additional Author(s)
Decky Robot
Publisher
Surabaya: 2002
Language
Indonesian
ISBN
-
Series
Tesis NO. 055/MTS
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
CONSTRUCTION INDUSTRY-RESEARCH
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 202 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00740/03
(T2) 690.0683 Rob P
-
Unavailable : Removed
Similar Collection
by author or subject
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Analisa durasi rencana aktivitas dan evaluasi pelaksanaan jadwal pada suatu proyek konstruksi gedung bertingkat (studi kasus pada proyek "X")
Tingkat kepentingan dan alokasi resiko pada proyek konstruksi
Perencanaan site layout proyek konstruksi dengan menggunakan integrated cad-based model
Studi kasus penerapan rekayasa nilai pada suatu proyek rumah tinggal
Building production and project management
Penerapan resource allocation dan levelling tenaga kerja dengan menggunakan microsoft project 2010 pada suatu proyek konstruksi
Keterkaitan kuantitas perkerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi