Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Author
Robot, Decky
Additional Author(s)
Decky Robot
Publisher
Surabaya: 2002
Language
Indonesian
ISBN
-
Series
Tesis NO. 055/MTS
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
CONSTRUCTION INDUSTRY-RESEARCH
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 202 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00740/03
(T2) 690.0683 Rob P
-
Unavailable : Removed
Similar Collection
by author or subject
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Menghitung umur penggantian berat yang optimum dengan biaya daur kehidupan yang minimum
Construction productivity management
Studi tentang upah dan upah lembur tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Analisa pengambilan keputusan dalam pemilihan metode bekisting pada bangunan silo di Gresik
Studi kasus penjadwalan proyek pada proyek rumah toko X menggunakan microsoft project 2010
Studi kasus aplikasi critical path method with multiple calendars pada proyek graha bukopin
Studi tentang kepercayaan pengembang perumahan kepada kontraktor