Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Author
Robot, Decky
Additional Author(s)
Decky Robot
Publisher
Surabaya: 2002
Language
Indonesian
ISBN
-
Series
Tesis NO. 055/MTS
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
CONSTRUCTION INDUSTRY-RESEARCH
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 202 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00740/03
(T2) 690.0683 Rob P
-
Unavailable : Removed
Similar Collection
by author or subject
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Pandangan konsultan perencana terhadap design rework dan aktivitas menunggu pada pekerjaan desain
Standarisasi jenis pekerjaan dalam rab untuk pekerjaan struktur bangunan tinggi di Indonesia
Construction project management
Perbandingan komposisi pekerja pasangan dinding bata antara SNI 2008 dengan kenyataan di lapangan...
Contractor's management handbook
Design and the economics of building
Usulan sistem pengendalian biaya proyek (studi kasus kontraktor a, b dan c di Surabaya)