Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Usulan sistem pengendalian biaya proyek (studi kasus kontraktor a, b dan c di Surabaya)
Author
Susanto, Fonny Kurniawati
Additional Author(s)
-
Publisher
Surabaya: Program Pascasarjana Teknik Sipil Magister Teknik UK Petra , 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01000112/MTS/2008
Subject(s)
CONSTRUCTION INDUSTRY-RESEARCH
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 124 - 155
Bibliography: p. 123
Abstract
-
Physical Dimension
Number of Page(s)
xv, 155 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00964/08
(T2) - 692.5 Sus U
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Hubungan antara motivasi mandor dan produktivitasnya pada proyek mall di Surabaya
Survey pemanfaatan teknologi informasi pada industri konstruksi di Surabaya
Infrastructure for the built environment
Estimasi dan komposisi biaya beberapa proyek ruko
Pengukuran produktivitas dan faktor-faktor yang memengaruhi pada pekerjaan konstruksi dengan metode half-slab
Analisa pasar student apartment di Surabaya
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Penggunaan penyelesaian sengketa pada proyek konstruksi