Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Usulan sistem pengendalian biaya proyek (studi kasus kontraktor a, b dan c di Surabaya)
Author
Susanto, Fonny Kurniawati
Additional Author(s)
-
Publisher
Surabaya: Program Pascasarjana Teknik Sipil Magister Teknik UK Petra , 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01000112/MTS/2008
Subject(s)
CONSTRUCTION INDUSTRY-RESEARCH
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 124 - 155
Bibliography: p. 123
Abstract
-
Physical Dimension
Number of Page(s)
xv, 155 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00964/08
(T2) - 692.5 Sus U
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Hubungan antara motivasi mandor dan produktivitasnya pada proyek mall di Surabaya
Dasar penyusunan anggaran biaya bangunan
Model matematis hubungan kinerja konsultan dan komunikasi dalam proyek konstruksi
Analisis pengaruh variabel lokasi, produk, harga, promosi, pelayanan dan desain terhadap minat konsumen factory outlet di Surabaya
Analisa sumber dan jenis informasi marketing intellegence yang diperlukan dalam penawaran tender kontraktor
Studi tentang kepercayaan pengembang perumahan kepada kontraktor
Analisis pemilihan kontaktor dalam mencapai kinerja proyek
Construction management of steel construction