Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Usulan sistem pengendalian biaya proyek (studi kasus kontraktor a, b dan c di Surabaya)
Author
Susanto, Fonny Kurniawati
Additional Author(s)
-
Publisher
Surabaya: Program Pascasarjana Teknik Sipil Magister Teknik UK Petra , 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01000112/MTS/2008
Subject(s)
CONSTRUCTION INDUSTRY-RESEARCH
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 124 - 155
Bibliography: p. 123
Abstract
-
Physical Dimension
Number of Page(s)
xv, 155 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00964/08
(T2) - 692.5 Sus U
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Hubungan antara motivasi mandor dan produktivitasnya pada proyek mall di Surabaya
Perencanaan elemen struktur baja berdasarkan SNI 1729 : 2015
CPM in construction management
Pembuatan model utilitas untuk faktor-faktor internal dalam strategi tender
Analisis unsafe act dan unsafe condition pada proyek pembangunan gedung x
Means graphic construction standards
Produktifitas pekerjaan jacked pile driving dan faktor-faktor yang mempengaruhinya
Construction equipment policy