Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Usulan sistem pengendalian biaya proyek (studi kasus kontraktor a, b dan c di Surabaya)
Author
Susanto, Fonny Kurniawati
Additional Author(s)
-
Publisher
Surabaya: Program Pascasarjana Teknik Sipil Magister Teknik UK Petra , 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01000112/MTS/2008
Subject(s)
CONSTRUCTION INDUSTRY-RESEARCH
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 124 - 155
Bibliography: p. 123
Abstract
-
Physical Dimension
Number of Page(s)
xv, 155 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00964/08
(T2) - 692.5 Sus U
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Hubungan antara motivasi mandor dan produktivitasnya pada proyek mall di Surabaya
Standarisasi jenis pekerjaan dalam rab untuk pekerjaan struktur bangunan tinggi di Indonesia
Program optimasi jumlah backhoe- dump truck dalam operasi penggalian tanah mekanis
Faktor tidak selesainya pekerjaan pada proyek konstruksi
Penggunaan spreadsheet untuk pengendalian biaya pada proyek "rumah-toko"
Penggunaan spreadsheet untuk pengendalian biaya pada proyek "rumah-toko"
Karakteristik pembangunan rumah burung walet dilihat dari aspek manajemen konstruksi
Rencana dan estimate real of cost