Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Hubungan antara motivasi mandor dan produktivitasnya pada proyek mall di Surabaya
Author
Susanto, Fonny Kurniawati
Additional Author(s)
Andryanto, Herry
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20301490/SIP/2006
Subject(s)
CONTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 107 - 139
Bibliography: p. 104 - 106
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 139 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05047/06
(T) - 658.924 Sus H
-
Unavailable : Removed
Similar Collection
by author or subject
Usulan sistem pengendalian biaya proyek (studi kasus kontraktor a, b dan c di Surabaya)
Perbandingan penjadwalan proyek menggunakan kurva "S" dan CPM network pada proyek "X" di Surabaya
Project management
Model prediksi sukses proyek dengan kriteria-kriteria prakualifikasi kontraktor
Pengaruh dari faktor-faktor yang berperan dalam pemilihan project delivery system di Surabaya
Penerapan metode time impact analysis pada sebuah proyek bangunan gedung bertingkat di Surabaya
Identifikasi faktor-faktor penentu dalam pengadaan dan pemilihan Ruko di Surabaya
Optimasi site layout pada proyek konstruksi caspian tower dengan menggunakan metode metaheuristik berdasarkan traveling distance pekerja