Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengaruh dari faktor-faktor yang berperan dalam pemilihan project delivery system di Surabaya
Author
Alberto, Lim
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2012
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011832/SIP/2012
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix : p. 45 - 70
Bibliography : p. 43 - 44
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 70 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01858/12
(T) 658.924 Alb P
-
Unavailable : Removed
Similar Collection
by author or subject
The Breeden realty office building construction schedule
Pengaruh keterlambatan proyek terhadap pembengkaan biaya proyek
Manajemen proyek 23 Mei - 3 Juni 1977
Analisis produktivitas jam normal dan jam lembur pada pekerjaan struktur beton bertulang
Usulan perancangan sistem informasi manajemen pengendalian mutu pekerjaan beton konvensional di perusahaan jasa konstruksi
Studi kasus pengaruh change order terhadap keterlambatan proyek pada proyek X
Survei awal kesiapan kontraktor di Surabaya dalam menerapkan "Time Impact Analysis"
Analisa faktor dan uji diskriminan terhadap kepuasan penghuni apartemen sekitar kampus di Surabaya