Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengaruh dari faktor-faktor yang berperan dalam pemilihan project delivery system di Surabaya
Author
Alberto, Lim
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2012
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011832/SIP/2012
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix : p. 45 - 70
Bibliography : p. 43 - 44
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 70 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01858/12
(T) 658.924 Alb P
-
Unavailable : Removed
Similar Collection
by author or subject
Model prediksi sukses proyek dengan kriteria-kriteria prakualifikasi kontraktor
Reduce, reuse, recycle, dan salvage terhadap construction waste pada proyek konstruksi di Surabaya
Kepercayaan sebagai salah satu faktor kepuasan kerja untuk mencapai keberhasilan proyek perumahan
Pengendalian pelaksanaan struktur gedung bertingkat untuk menghasilkan cara kerja yang efektip
Project management
Studi implementasi sistem last planner pada proyek 'x' di Surabaya
Studi kasus mengenai struktrur organisasi pelaksana lapangan pada proyek konstruksi di Surabaya
Pengaruh beberapa faktor budaya Bali terhadap motivasi kerja pekerja konstruksi, dan perbedaannya pada beberapa proyek di Denpasar