Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Monitoring dan analisis jadwal proyek menggunakan metode performance intensity dan CPM pada proyek hotel
Author
Setiadi, Ivan P.
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Tesis No. 01000199/MTS/2015
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
INDUSTRIAL PROJECT-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 55-166
. Bibliography: p. 54.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 166 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02431/15
(T2) MTS 0199
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa faktor-faktor positioning perusahaan kontraktor kelas B (besar) di Surabaya
Impacts of managerial and operational problems on facility layout arrangement in multi products precasting yards
Perkreditan kontraktor kualifikasi kecil
Peranan manajer proyek sebagai pemimpin dalam membangun kepercayaan pada proyek konstruksi di Surabaya
Manajemen konstruksi
Potret penerapan perencanaan dan pengendalian jadwal proyek pada suatu kontraktor BUMN
Project management
Perbandingan resource leveling dengan menggunakan aplikasi program microsoft project 2010 dan primavera