Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Monitoring dan analisis jadwal proyek menggunakan metode performance intensity dan CPM pada proyek hotel
Author
Setiadi, Ivan P.
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Tesis No. 01000199/MTS/2015
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
INDUSTRIAL PROJECT-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 55-166
. Bibliography: p. 54.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 166 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02431/15
(T2) MTS 0199
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa dan evaluasi sisa material konstruksi pada proyek ciputra world Surabaya
Pandangan kontraktor mengenai kualitas dokumen desain dan dampaknya pada proses konstruksi
Studi aspek material konstruksi pada tahap perencanan dan pelaksanaan konstruksi
Faktor sukses kemitraan antara kontraktor dan subkontraktor pada proyek mall di Surabaya
Studi tentang analisa pembengkakan biaya dan waktu pada proyek konstruksi real estate
Faktor-faktor yang mempengaruhi pelaksanaan pembayaran dalam proyek konstruksi
Analisa penjadwalan pekerjaan dinding pra-cetak
Potret penerapan perencanaan dan pengendalian jadwal proyek pada suatu kontraktor BUMN