Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor-faktor yang mempengaruhi sub-kontraktor untuk mengikuti tender dan menentukan nilai mark-up
Author
Winata, Rio Andriestian
Additional Author(s)
Wijaya, Purnomo Putra
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011769/SIP/2010
Subject(s)
BUILDING-CONTRACTS AND SPECIFICATION
PROJECT MANAGEMENT
Notes
Appendix : p. 56 - 70
Bibliography : p. 55
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 70 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01892/11
(T) 692.8 Win F
-
Unavailable : Removed
Similar Collection
by author or subject
Sistem optimalisasi penjadwalan linear scheduling method pada proyek saluran irigasi
Survei awal kesiapan kontraktor di Surabaya dalam menerapkan "Time Impact Analysis"
Upaya penerapan source validation protocol dari forensic schedule analysis pada salah satu proyek gedung bertingkat di Surabaya
Manajemen proyek
Pengantar evaluasi proyek
Project management toolBox
Project management 2.0
Penerapan program dinamis probabilistik pada manajemen proyek konstruksi