Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi tentang project closeout pada proyek gedung T (gedung kuliah dan poliklinik) Universitas Kristen Petra
Author
Susanto, Arianti
Additional Author(s)
Fince
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20301460/SIP/2006
Subject(s)
PROJECT MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 118 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01489/06
(T) - 658.404 Sus S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Optimasi infrastruktur
Hubungan overtime dengan produktivitas pekerjaan pembesian (studi kasus pada proyek x, y, dan z)
Eliminasi shear locking pada elemen pelat reissner-mindlin berbasis kriging dengan metode discrete shear GAP (DSG)
Marine works with cost estimation for ashkelon desalination project
Perbandingan aplikasi progam Microsoft Project dan Primavera dalam penjadwalan proyek konstruksi
Analisis jadwal pelaksanaan pekerjaan struktur proyek 6 lantai dengan menggunakan program microsoft project 2003
Analisa penjadwalan pekerjaan dinding pra-cetak
Analisa pengambilan keputusan dalam pemilihan metode bekisting pada bangunan silo di Gresik