Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan produktivitas pekerjaan pasangan dinding bata ringan dan bata merah pada proyek perumahan di Surabaya
Author
Hartedja, Stanislaus Evan
Additional Author(s)
Kawitan, Kornelius Henry
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011939/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix: p. 42 - 47
. Bibliography: p. 41.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 47 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02567/14
(T) SIP 1939
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Identifikasi dan penanganan keterlambatan pekerjaan struktur dan finishing pada proyek sekolah 'X'
Model prediksi sukses proyek dengan kriteria-kriteria prakualifikasi kontraktor
Key Performance indicators (KPIs) yang digunakan untuk mengukur kesuksesan proyek konstruksi
Model pengukuran tingkat motivasi dan demotivasi staf teknik perusahaan konsultan di Surabaya
Proporsi biaya tiap satuan pekerjaan struktur beton bertulang proyek konstruksi bangunan tinggi
Faktor-faktor yang mempengaruhi pemeliharaan ditinjau dari pengorganisasian tenaga kerja dan biaya pemeliharaan apartemen dan kondominium
Pengaruh tindakan tidak aman (unsafe act) dan kondisi tidak aman (usafe condiition) terhadap kecelakaan kerja konstruksi
Faktor-faktor lapangan yang mempengaruhi produktivitas pekerja pada proyek konstruksi