Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor sukses kemitraan antara kontraktor dan subkontraktor pada proyek mall di Surabaya
Author
Anggraini, Leyvi
Additional Author(s)
Kurnia, Dwi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20301459/SIP/2006
Subject(s)
PROJECT MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 97 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01480/06
(T) - 658.404 Ang F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perbandingan kurva 'S' dan CPM network sebagai sarana untuk perencanaan jadwal proyek
Using the project management maturity model
Studi kasus perbandingan berbagai bata ringan dari segi material biaya, dan produktivitas
Studi mengenai manajemen resiko pada kontraktor rumah tinggal sehat sederhana di Surabaya dan sekitarnya
Integrating program management and systems engineering
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Manajemen proyek konstruksi
Analisis penyebab dan solusi terhadap sisa material batu bata, besi tulangan dan kayu