Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan penjadwalan sumber daya manusia pada proyek konstruksi dengan program primavera
Author
Kurniawan, Albert
Additional Author(s)
Sanjoyo, Ryan Nyoto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011794/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix : p. 86 - 161
. Bibliography : p. 84 - 85.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 161 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00642/13
(T) 690.0683 Kur P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Faktor-faktor permasalahan pengembangan perusahaan kontraktor di Tana Toraja
Sebab-sebab dan pengaruh klaim konstruksi di Surabaya
Human resource management in construction projects
Analisis perencanaan dan pengendalian aliran kas untuk proyek konstruksi
Sistem jaminan kualitas dan biaya kualitas pada proyek tangki elpiji
Penerapan approximate cost estimate pada struktur beton bertulang bangunan ruko (SOHO)
Studi faktor-faktor penyebab change order pada proyek konstruksi di Surabaya yang menggunakan kontrak traditional serta design-build
Perubahan harga BBM terhadap biaya konstruksi rumah sehat sederhana (RSH)