Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan penjadwalan sumber daya manusia pada proyek konstruksi dengan program primavera
Author
Kurniawan, Albert
Additional Author(s)
Sanjoyo, Ryan Nyoto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011794/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix : p. 86 - 161
. Bibliography : p. 84 - 85.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 161 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00642/13
(T) 690.0683 Kur P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi kasus harga satuan upah dan bahan beton bertulang untuk proyek bangunan satu lantai
Marine works with cost estimation for ashkelon desalination project
Model faktor-faktor penyebab dan dampak keterlambatan proyek konstruksi di Surabaya
Perhitungan produktivitas tenaga kerja pekerjaan bekisting dengan metode level of effort
Penelitian awal penanganan kontraktor terhadap direct waste material pada proyek konstruksi di Surabaya
Usulan sistem pengendalian biaya proyek (studi kasus kontraktor a, b dan c di Surabaya)
Penerapan marketing mix oleh kontraktor pemula di Surabaya
Identifikasi dan penanganan keterlambatan pekerjaan struktur dan finishing pada proyek sekolah 'X'