Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan penjadwalan sumber daya manusia pada proyek konstruksi dengan program primavera
Author
Kurniawan, Albert
Additional Author(s)
Sanjoyo, Ryan Nyoto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011794/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix : p. 86 - 161
. Bibliography : p. 84 - 85.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 161 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00642/13
(T) 690.0683 Kur P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perhitungan produktivitas tenaga kerja pekerjaan bekisting dengan metode level of effort
Penelitian mengenai pengaruh polypropylene fibre pada self compacting concrete terhadap kuat tekan dan kuat tarik
Manajemen proyek konstruksi
Analisa faktor-faktor positioning perusahaan kontraktor kelas B (besar) di Surabaya
Key Performance indicators (KPIs) yang digunakan untuk mengukur kesuksesan proyek konstruksi
Perbandingan tingkat kepentingan dan kepuasan antara insentif finansial dan insentif non-finansial bagi staf karyawan lapangan dan kantor
Studi kasus perbandingan berbagai bata ringan dari segi material, biaya, dan produktivitas
Pengaruh faktor motivasi dalam keberhasilan keselamatan dan kesehatan pada konstruksi bangunan berkelanjutan