Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Model faktor-faktor penyebab dan dampak keterlambatan proyek konstruksi di Surabaya
Author
Desyllia
Additional Author(s)
Chendra, Fibbie
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011935/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 71 - 128
. Bibliography: p. 68 - 70.
Abstract
-
Physical Dimension
Number of Page(s)
xv, 128 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01376/14
(T) 658.924 Des M
-
Unavailable : Removed
Similar Collection
by author or subject
Tingkat kepentingan dan tingkat kepuasan dari faktor-faktor motivasi pekerja konstruksi
The Project resource manual
Pengaruh ketidakberaturan massa vertikal pada bangunan yang direncanakan secara direct displacement based design
Skedul kebutuhan sumber daya pada proyek sekolah dengan menggunakan program primavera
Analisa faktor kepuasan penghuni apartemen menengah bawah di Surabaya
Studi mengenai dampak lingkungan selama tahap pelaksanaan konstruksi gedung bertingkat
Evaluasi apartemen High Point dari aspek finansial
Potret penerapan perencanaan dan pengendalian jadwal proyek pada suatu kontraktor BUMN