Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Model faktor-faktor penyebab dan dampak keterlambatan proyek konstruksi di Surabaya
Author
Desyllia
Additional Author(s)
Chendra, Fibbie
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011935/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 71 - 128
. Bibliography: p. 68 - 70.
Abstract
-
Physical Dimension
Number of Page(s)
xv, 128 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01376/14
(T) 658.924 Des M
-
Unavailable : Removed
Similar Collection
by author or subject
Executing your strategy
Sistem optimalisasi penjadwalan linear scheduling method pada proyek saluran irigasi
Critical chain project management
Studi tentang generic strategy terhadap kontraktor pemula
Proyek the twin towers apartment Surabaya
Identifikasi dan alokasi risiko-risiko pada proyek superblok di Surabaya
Analisis sisa material dalam pekerjaan beton bertulang pada proyek konstruksi
Penerapan faktor-faktor sukses kunci yang menunjang keberhasilan suatu proyek apartemen