Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Model faktor-faktor penyebab dan dampak keterlambatan proyek konstruksi di Surabaya
Author
Desyllia
Additional Author(s)
Chendra, Fibbie
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011935/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 71 - 128
. Bibliography: p. 68 - 70.
Abstract
-
Physical Dimension
Number of Page(s)
xv, 128 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01376/14
(T) 658.924 Des M
-
Unavailable : Removed
Similar Collection
by author or subject
Penentuan produktivitas pekerja sebagai dasar penentuan upah (studi kasus pada proyek perkantoran)
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Studi faktor-faktor penyebab change order pada proyek konstruksi di Surabaya yang menggunakan kontrak traditional serta design-build
Project management and teamwork
Analisis perlakuan akuntansi pada perusahaan jasa konstruksi
Studi tentang asuransi all risk pada perusahaan konstruksi
Analisa dampak kenaikan harga BBM terhadap biaya konstruksi
Pengukuran produktivitas pekerjaan dinding hebel studi kasus pada proyek apartemen x