Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Model faktor-faktor penyebab dan dampak keterlambatan proyek konstruksi di Surabaya
Author
Desyllia
Additional Author(s)
Chendra, Fibbie
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011935/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 71 - 128
. Bibliography: p. 68 - 70.
Abstract
-
Physical Dimension
Number of Page(s)
xv, 128 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01376/14
(T) 658.924 Des M
-
Unavailable : Removed
Similar Collection
by author or subject
Construction management fundamentals
Monitoring dan analisis jadwal proyek menggunakan metode performance intensity dan CPM pada proyek hotel
Project Professional 2010
Sistem manajemen informasi arus kas secara terpusat (studi kasus pada PT. X )
Perbandingan sistem tunggal dan sistem ganda struktur baja rangka terbreis konsentris khusus berbentuk V terbalik dengan direct analysis method
Identifikasi faktor-faktor yang mempengaruhi "time performance" dari kontraktor proyek ruko di Surabaya
Analisa CPM dan bar-chart dengan menggunakan program microsoft project (Studi kasus bangunan kampus ITN 4 lantai di Malang)
Modifikasi teknik discrete shear GAP pada elemen balok timoshenko berbasis kriging dan pembentukan elemen makro segitiga pelat reissner-mindlin