Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak di pembangunan proyek rusun Surabaya
Author
Dwipurwanto, Bagus
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Tesis No. 01000228/MTS/2016
Subject(s)
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 112-117
. Bibliography: p. 110-111.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 117 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00604/17
(T2) MTS 0228
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Manajemen proyek konstruksi
Perancangan program pemilihan kontraktor pemenang dalam proses tender pada proyek perumahan di Surabaya
Produktivitas pengecoran beton ready-mixed dengan concrete pump dan tower crane (Studi Kasus: Proyek Ciputra World Surabaya)
Menghitung umur penggantian berat yang optimum dengan biaya daur kehidupan yang minimum
Studi implementasi sistem last planner pada proyek 'x' di Surabaya
Construction contracting
Faktor sukses kritis dalam project briefing (studi kasus pada proyek pasar pemerintah kotamadya Surabaya)
Sebuah model penjadwalan dan pengendalian material dalam pelaksanaan proyek konstruksi