Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak di pembangunan proyek rusun Surabaya
Author
Dwipurwanto, Bagus
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Tesis No. 01000228/MTS/2016
Subject(s)
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 112-117
. Bibliography: p. 110-111.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 117 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00604/17
(T2) MTS 0228
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis pengaruh variabel lokasi, produk, harga, promosi, pelayanan dan desain terhadap minat konsumen factory outlet di Surabaya
Menghitung umur penggantian berat yang optimum dengan biaya daur kehidupan yang minimum
Penerapan value engineering pada proyek konstruksi
Project management
Penerapan quality function deployment dalam bidang konstruksi
Studi literatur tentang berbagai macam sertifikasi di dunia konstruksi
Sebuah model penjadwalan dan pengendalian material dalam pelaksanaan proyek konstruksi
Studi kasus penerapan metode collapsed as-built terhadap sebuah bangunan perkuliahan di kota Surabaya