Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak di pembangunan proyek rusun Surabaya
Author
Dwipurwanto, Bagus
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Tesis No. 01000228/MTS/2016
Subject(s)
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 112-117
. Bibliography: p. 110-111.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 117 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00604/17
(T2) MTS 0228
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa produktivitas pekerjaan bekisting dan pembesian pada beberapa bagian struktur bagian atas
Analisis sumber daya manusia untuk perencanaan jadwal CPM pada proyek ruko
Studi literatur tentang prinsip-prinsip lean construction
Analisa sensitifitas penetapan harga proyek "X" dengan model fair and reasonable markup (FARM)
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak untuk proyek pembangunan apartemen X dan hotel Y di Surabaya
Studi literatur tentang penerapan learning organization pada perusahaan kontraktor
Perbandingan tingkat kepentingan dan kepuasan antara insentif finansial dan insentif non-finansial bagi staf karyawan lapangan dan kantor
Pandangan konsultan perencana terhadap design rework dan aktivitas menunggu pada pekerjaan desain