Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak di pembangunan proyek rusun Surabaya
Author
Dwipurwanto, Bagus
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Tesis No. 01000228/MTS/2016
Subject(s)
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 112-117
. Bibliography: p. 110-111.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 117 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00604/17
(T2) MTS 0228
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa frekuensi dan penyebab change order pada proyek apartemen di Surabaya
Analisa faktor-faktor yang mendukung brand image terhadap pengembangan realestat di Surabaya
Construction equipment policy
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Building production and project management
Information methods
Tingkat kepentingan faktor-faktor produktivitas pekerja konstruksi berdasarkan tingkat pengaruh dan tingkat frekuensi
Evaluasi sistem estimasi biaya proyek pada perusahaan kontraktor di surabaya