Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor sukses kritis dalam project briefing (studi kasus pada proyek pasar pemerintah kotamadya Surabaya)
Author
Kuswara, Khoe Ronaldo
Additional Author(s)
Listyani
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011585/SIP/2008
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 106 - 118
Bibliography: p. 103 - 105
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 118 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03221/08
(T) - 690.068 Kus F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Construction scheduling
Perbandingan produktivitas tenaga kerja untuk beberapa jenis pekerjaan pada bangunan perumahan
Studi kasus pengukuran pengaruh faktor-faktor terhadap produktivitas pekerja pada proyek konstruksi
Analisa CPM dan bar-chart dengan menggunakan program microsoft project (Studi kasus bangunan kampus ITN 4 lantai di Malang)
Studi literatur tentang berbagai macam sertifikasi di dunia konstruksi
Studi kasus mengenai struktrur organisasi pelaksana lapangan pada proyek konstruksi di Surabaya
Construction equipment policy
Studi kasus sistem informasi akuntansi pada perusahaan konstruksi PT. X