Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor sukses kritis dalam project briefing (studi kasus pada proyek pasar pemerintah kotamadya Surabaya)
Author
Kuswara, Khoe Ronaldo
Additional Author(s)
Listyani
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011585/SIP/2008
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 106 - 118
Bibliography: p. 103 - 105
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 118 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03221/08
(T) - 690.068 Kus F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Usulan perancangan sistem informasi manajemen pengendalian mutu pekerjaan beton konvensional di perusahaan jasa konstruksi
Penentuan buffer sizing dalam penerapan critical chain project management pada sebuah proyek konstruksi
Pengaruh tindakan tidak aman (unsafe act) dan kondisi tidak aman (usafe condiition) terhadap kecelakaan kerja konstruksi
Program p3-tc untuk perhitungan waktu efektif penggunaan tower crane pada konstruksi bangunan bertingkat
Studi kasus pengukuran produktivitas dan pengaruh faktor-faktor pada pekerjaan plafon
Construction planning and scheduling
Studi tentang project closeout pada proyek gedung T (gedung kuliah dan poliklinik) Universitas Kristen Petra
Perencanaan dan pengendalian jadwal proyek dengan menggunakan metode CPM pada proyek apartemen