Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor sukses kritis dalam project briefing (studi kasus pada proyek pasar pemerintah kotamadya Surabaya)
Author
Kuswara, Khoe Ronaldo
Additional Author(s)
Listyani
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011585/SIP/2008
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 106 - 118
Bibliography: p. 103 - 105
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 118 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03221/08
(T) - 690.068 Kus F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Penerapan sistem manajemen lingkungan berdasarkan ISO 14000 pada kontraktor-kontraktor di Surabaya
Sustainable living
Optimasi site layout pada proyek konstruksi caspian tower dengan menggunakan metode metaheuristik berdasarkan traveling distance pekerja
Kriteria-kriteria yang dipakai untuk menentukan pengundangan kontraktor dalam mengikuti tender proyek-proyek Universitas Kristen Petra
Construction scheduling
Analisa penggembangan produk properti berdasarkan aspek non finansial dan aspek finansial
Project management toolBox
Studi kasus penjadwalan proyek pada proyek rumah toko X menggunakan microsoft project 2010