Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi implementasi sistem last planner pada proyek 'x' di Surabaya
Author
Iwan, Juarlik
Additional Author(s)
-
Publisher
Surabaya: Program Pascasarjana Teknik Sipil Magister Teknik UK Petra , 2009
Language
Indonesian
ISBN
-
Series
Tesis No. 01000137/MTS/2009
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 90 - 283
Bibliography : p. 87 - 89
Abstract
-
Physical Dimension
Number of Page(s)
xv, 283 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04506/09
(T) - 690.068 Iwa S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi tentang rentang periode ulang gempa pada tingkat kinerja damage control sistem rangka pemikul momen khusus (srpmk) struktur beton bertulang
Analisa perbandingan nilai produktivitas tenaga kerja dengan menggunakan metode standard dan aktual (studi kasus pada proyek X dan Y)
Analisa pasar student apartment di Surabaya
Produktivitas pengecoran beton ready-mixed dengan concrete pump dan tower crane (Studi Kasus: Proyek Ciputra World Surabaya)
Perbandingan produktivitas pekerjaan pasangan dinding bata ringan dan bata merah pada proyek perumahan di Surabaya
Kontrol material pada proyek konstruksi perumahan
Studi perbandingan sistem dan prosedur di dalam manajemen material dengan manajemen bahan bangunan pada proyek konstruksi "X"
Studi mengenai produktivitas tenaga kerja di proyek queen victoria