Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi implementasi sistem last planner pada proyek 'x' di Surabaya
Author
Iwan, Juarlik
Additional Author(s)
-
Publisher
Surabaya: Program Pascasarjana Teknik Sipil Magister Teknik UK Petra , 2009
Language
Indonesian
ISBN
-
Series
Tesis No. 01000137/MTS/2009
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 90 - 283
Bibliography : p. 87 - 89
Abstract
-
Physical Dimension
Number of Page(s)
xv, 283 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04506/09
(T) - 690.068 Iwa S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi tentang rentang periode ulang gempa pada tingkat kinerja damage control sistem rangka pemikul momen khusus (srpmk) struktur beton bertulang
Perbandingan resource leveling dengan menggunakan aplikasi program microsoft project 2010 dan primavera
Metode gabungan critical path method dan line of balance dan penerapannya pada proyek perumahan yang berulang
Perhitungan percent plan completed dan identifikasi faktor tidak tercapainya rencana pekerjaan pada.
Strategi sumber daya manusia untuk pekerja konstruksi (staf teknik)
Penelitian mengenai pengaruh polypropylene fibre pada self compacting concrete terhadap kuat tekan dan kuat tarik
Optimasi site layout pada proyek konstruksi caspian tower dengan menggunakan metode metaheuristik berdasarkan traveling distance pekerja
Evaluasi kinerja kontraktor swasta di Surabaya yang telah mempunyai ISO 9000