Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis pemilihan kontaktor dalam mencapai kinerja proyek
Author
Natalia, Shinta
Additional Author(s)
Lubalu, Ronald Osim
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011735/SIP/2010
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
BUILDINGS-CONTRACTS AND SPECIFICATIONS
Notes
Appendix : p. 99 - 158
Bibliography : p. 96 - 98
Abstract
-
Physical Dimension
Number of Page(s)
xix, 158 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03248/10
(T) 692.8 Nat A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Construction project scheduling and control
Building economics
Last planner system terhadap performa proyek konstruksi
Faktor-faktor penghambat value management process pada tahapan konstruksi
Analisa frekuensi dan besaran nilai change order serta faktor penyebabnya pada pekerjaan konstruksi bangunan tinggi
Produktivitas tower crane pada apartemen
Survei awal kesiapan kontraktor di Surabaya dalam menerapkan "Time Impact Analysis"
The Toyota product development system