Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis pemilihan kontaktor dalam mencapai kinerja proyek
Author
Natalia, Shinta
Additional Author(s)
Lubalu, Ronald Osim
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011735/SIP/2010
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
BUILDINGS-CONTRACTS AND SPECIFICATIONS
Notes
Appendix : p. 99 - 158
Bibliography : p. 96 - 98
Abstract
-
Physical Dimension
Number of Page(s)
xix, 158 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03248/10
(T) 692.8 Nat A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengukuran efektifitas dan frekuensi faktor yang mempengaruhi produktivitas pekerja pada pekerjaan finishing proyek rumah tinggal di Surabaya
Construction contracting
IT project portfolio management
Studi tentang perencanaan tapak dan analisis hubungan lebar jalan terhadap luas dan harga jual kapling pada beberapa perumahan di Surabaya
CPM in construction management
Metode gabungan critical path method dan line of balance dan penerapannya pada proyek perumahan yang berulang
Faktor-faktor yang mempengaruhi pelaksanaan pembayaran dalam proyek konstruksi
Studi litelatur tentang perkembangan critical chain method