Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Scheduling construction projects : principles and practice
Author
Weber, Sandra Christensen
Additional Author(s)
-
Publisher
Upper Saddle River, NJ: Pearson Prentice-Hall, 2005
Language
English
ISBN
0131148702
Series
Subject(s)
BUILDING-SUPERINTENDENCE
CONSTRUCTION INDUSTRY-MANAGEMENT
PRODUCTION SCHEDULING
Notes
Appendix: p. 297-324
Glossary: p. 285-292
. Index: p. 325-333.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 333 p.
Dimension
24 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03153/05
- 690.0685 Web S
Library - 7th Floor
Available
Similar Collection
by author or subject
Model pengaruh faktor laten terhadap perilaku pekerja pada cacat konstruksi
Sistem informasi manajemen untuk pengendalian biaya proyek PT. "ABC" pada proyek "X"
Identifikasi dan peringkat kriteria-kriteria prakualifikasi konsultan perencana dan konsultan pengawas
Construction management fundamentals
Identifikasi elemen-elemen penghambat dalam penerapan ISO 9002 pada perusahaan konstruksi serta upaya penanggulangannya
Approximate cost estimate berdasarkan kandungan besi dan kebutuhan bekisting pada struktur beton bertulang bangunan ruko (SOHO)
Keterkaitan kuantitas perkerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Construction management