Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus pengukuran produktivitas pekerjaan pemancangan pada proyek x dan faktor-faktor yang mempengaruhinya
Author
Koentjoro, Septian Andri
Additional Author(s)
Diantanu, Charendra Putra
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2012
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011866/SIP/2012
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix : p. 63 - 75
Bibliography : p. 62
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 75 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03924/12
(T) 690.068 Koe S
-
Unavailable : Removed
Similar Collection
by author or subject
Project management 2.0
Penyiapan bill of quantity untuk estimasi biaya pekerjaan konstruksi baja
Hubungan antara kepuasan kerja dengan motivasi pekerja pada perusahaan kontraktor di Surabaya
Integrating program management and systems engineering
Faktor-faktor yang mempengaruhi labor turnover dan dampaknya pada proyek konstruksi di Surabaya
Perbandingan aplikasi progam Microsoft Project dan Primavera dalam penjadwalan proyek konstruksi
Building economics
Optimasi multi-objektif permasalahan time-cost-quality trade-off pada proyek soho X dengan menggunakan metode metaheuristik