Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa pelaksanaan time management proyek konstruksi pada perusahaan kontraktor di Surabaya
Author
Margono, Budi
Additional Author(s)
Sianturi, Martua Raja
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1320/SIP/2004
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 56 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01604/04
(T) 690.068 Mar A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi pemanfaatan internet dalam pelaksanaan manajemen konstruksi
Etika bisnis konstruksi
Analisis penyebab dan solusi terhadap sisa material batu bata, besi tulangan dan kayu
Identifikasi nvaau dan studi vsm pada proyek X di Surabaya
Produktivitas tower crane pada apartemen
Model penilaian sukses proyek konstruksi dengan sasaran performa jadwal
Perbandingan sistem tunggal dan sistem ganda pada bangunan terbreis eksentris berbentuk V terbalik dan diagonal pada mid rise building
Studi tentang faktor-faktor penetapan harga produk perumahan di surabaya