Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa pelaksanaan time management proyek konstruksi pada perusahaan kontraktor di Surabaya
Author
Margono, Budi
Additional Author(s)
Sianturi, Martua Raja
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1320/SIP/2004
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 56 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01604/04
(T) 690.068 Mar A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi tentang produktivitas kelompok pekerja pada pekerjaan pasangan bata di proyek perumahan
Tingkat kepentingan dan alokasi resiko pada proyek konstruksi
Peranan manajer proyek sebagai pemimpin dalam membangun kepercayaan pada proyek konstruksi di Surabaya
Analisis penyebab dan solusi terhadap sisa material batu bata, besi tulangan dan kayu
Principles of construction management
Total construction project management
Survei kepuasan pengguna ruko terhadap jasa broker properti Surabaya
Studi kasus penerapan metode pert pada proyek gudang