Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa pelaksanaan time management proyek konstruksi pada perusahaan kontraktor di Surabaya
Author
Margono, Budi
Additional Author(s)
Sianturi, Martua Raja
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1320/SIP/2004
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 56 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01604/04
(T) 690.068 Mar A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Permodelan penjadwalan linier dengan alokasi sumber daya manusia pada proyek perumahan
Optimasi construction site layout menggunakan metode metahueristic algorithm pada proyek great hotel Diponegoro
Analisa produktivitas pekerjaan bekisting dan pembesian pada beberapa bagian struktur bagian atas
Faktor sukses kritis dalam project briefing (studi kasus pada proyek pasar pemerintah kotamadya Surabaya)
Model pengukuran tingkat motivasi dan demotivasi staf teknik perusahaan konsultan di Surabaya
Program p3-tc untuk perhitungan waktu efektif penggunaan tower crane pada konstruksi bangunan bertingkat
Penerapan material requirement planning pada suatu proyek konstruksi
Project management