Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi tentang produktivitas kelompok pekerja pada pekerjaan pasangan bata di proyek perumahan
Author
Kusumo, Fredy Hadi
Additional Author(s)
Mustaring
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011582/SIP/2008
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
LABOR PRODUCTIVITY
Notes
Appendix: p. 60 - 67
Bibliography: p. 59
Abstract
-
Physical Dimension
Number of Page(s)
xv, 67 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03220/08
(T) - 690.068 Kus S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi kasus aplikasi critical path method with multiple calendars pada proyek graha bukopin
Perbandingan waktu tempuh ideal dan waktu tempuh aktual tower crane dalam proyek konstruksi
Studi awal waktu pengecoran balok plat pada proyek bangunan bertingkat 6 lantai di Surabaya
Sebuah model penjadwalan dan pengendalian material dalam pelaksanaan proyek konstruksi
Manajemen dalam pelaksanaan pembangunan
Analisis sumber daya manusia untuk perencanaan jadwal CPM pada proyek ruko
Studi kasus perencanaan alokasi kebutuhan bahan pada proyek konstruksi gedung kuliah dan poliklinik Universitas Kristen Petra
Analisis faktor-faktor yang dipertimbangkan konsumen dalam memilih lokasi perumahan menengah di Denpasar dan Kabupaten Badung, Bali