Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengaruh sistem manajemen k3 terhadap waktu dan biaya proyek
Author
Liono, Kevin Budhie
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011797/SIP/2011
Subject(s)
BUILDING-SAFETY MEASURES
CONSTRUCTION PROJECTS-MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 42 - 69
Bibliography : p. 41
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 69 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03626/11
(T) 690.22 Lio P
-
Unavailable : Removed
Similar Collection
by author or subject
Studi tentang produktivitas kelompok pekerja pada pekerjaan pasangan bata di proyek perumahan
Perbandingan aplikasi progam Microsoft Project dan Primavera dalam penjadwalan proyek konstruksi
Pengaruh beberapa faktor budaya Bali terhadap motivasi kerja pekerja konstruksi, dan perbedaannya pada beberapa proyek di Denpasar
Perencanaan dan penjadwalan sumber daya manusia pada proyek konstruksi dengan program primavera
Penentuan produktivitas tenaga kerja dalam kaitannya dengan usaha peningkatan produktivitas
Studi tentang perencanaan tapak dan analisis hubungan lebar jalan terhadap luas dan harga jual kapling pada beberapa perumahan di Surabaya
Analisis sumber daya manusia untuk perencanaan jadwal CPM pada proyek ruko
Analisa CPM dan bar-chart dengan menggunakan program microsoft project (Studi kasus bangunan kampus ITN 4 lantai di Malang)