Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan percent plan completed dan identifikasi faktor tidak tercapainya rencana pekerjaan pada.
Author
Jonathan, Steven
Additional Author(s)
Jaya K., Robby Dwi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011903/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 121-122.
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 122 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02784/13
(T) 658.924 Jon P
-
Unavailable : Removed
Similar Collection
by author or subject
Sistem informasi manajemen untuk pengendalian biaya proyek PT. "ABC" pada proyek "X"
Studi tentang constructability concept berdasarkan sasaran proyek
Model sumber dan penyebab rework pada tahapan proyek konstruksi
Analisa studi perbandingan antara rumah toko dengan kombinasi rumah toko-stand ditinjau dari aspek pemasaran dan finansial pada proyek gateway, Sidoarjo
Strategy in working capital management under adverse economic condition: a case study of Indonesia construction smes
Peranan broker properti dalam pemasaran produk real estate
Design and the economics of building
Risiko dan penanganannya pada proyek konstruksi: studi kasus pada proyek gedung dan infrastruktur