Perhitungan percent plan completed dan identifikasi faktor tidak tercapainya rencana pekerjaan pada.
Author
Jonathan, Steven
Additional Author(s)
Jaya K., Robby Dwi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011903/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 121-122.
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 122 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02784/13
(T) 658.924 Jon P
-
Unavailable : Removed
Similar Collection
by author or subject
Principles of construction management
Menghitung umur penggantian berat yang optimum dengan biaya daur kehidupan yang minimum
Analisa pengambilan keputusan dalam pemilihan metode bekisting pada bangunan silo di Gresik
Construction contracting
Eliminasi shear locking pada elemen pelat reissner-mindlin berbasis kriging dengan metode discrete shear GAP (DSG)
Tantangan yang berpengaruh dan keterampilan manajer proyek pada proyek bangunan hijau
Identifikasi dan alokasi risiko-risiko pada proyek superblok di Surabaya
Studi tentang harga satuan upah pada proyek konstruksi