Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan percent plan completed dan identifikasi faktor tidak tercapainya rencana pekerjaan pada.
Author
Jonathan, Steven
Additional Author(s)
Jaya K., Robby Dwi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011903/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 121-122.
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 122 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02784/13
(T) 658.924 Jon P
-
Unavailable : Removed
Similar Collection
by author or subject
Kajian metode takt time pada proyek konstruksi
Studi literatur tentang berbagai macam sertifikasi di dunia konstruksi
Studi kasus produktivitas pekerjaan produksi dan pemasangan dinding precast pada proyek apartemen
Identifikasi faktor-faktor penentu dalam pengadaan dan pemilihan Ruko di Surabaya
Studi kasus perencanaan alokasi kebutuhan tenaga kerja pada proyek konstruksi gedung kuliah dan poliklinik Universitas Kristen Petra
Survei tingkat kepentingan dan penerapan sumber dan siklus material dari greenship rating tools pada proyek konstruksi
Pengaruh motivasi dan disiplin kerja terhadap produktivitas pekerja pada proyek X
Penerapan marketing mix oleh kontraktor pemula di Surabaya