Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan percent plan completed dan identifikasi faktor tidak tercapainya rencana pekerjaan pada.
Author
Jonathan, Steven
Additional Author(s)
Jaya K., Robby Dwi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011903/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 121-122.
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 122 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02784/13
(T) 658.924 Jon P
-
Unavailable : Removed
Similar Collection
by author or subject
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Analisis biaya dan kemungkinan investasi rumah tipe di Citra Raya dan Wisata Bukit Mas
Pengaruh budaya keselamatan kerja pada perilaku pekerja terhadap keselamatan kerja
Manajemen konstruksi
Studi harga satuan upah untuk proyek bangunan tinggi
Optimasi site layout pada proyek konstruksi caspian tower dengan menggunakan metode metaheuristik berdasarkan traveling distance pekerja
Studi kasus mengenai sisa material baja tulangan pada proyek ruko
Harapan dan realita sistem manajemen mutu ISO 9000 dalam penerapannya di perusahaan kontraktor