Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan percent plan completed dan identifikasi faktor tidak tercapainya rencana pekerjaan pada.
Author
Jonathan, Steven
Additional Author(s)
Jaya K., Robby Dwi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011903/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 121-122.
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 122 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02784/13
(T) 658.924 Jon P
-
Unavailable : Removed
Similar Collection
by author or subject
Pandangan kontraktor mengenai kualitas dokumen desain dan dampaknya pada proses konstruksi
Analisis faktor-faktor yang mempengaruhi perilaku konsumen dalam pembelian rumah menengah di Surabaya Barat
Klasifikasi upah berdasarkan produktivitas pekerja, untuk berbagai macam pekerjaan konstruksi
Construction production planning and optimal control
Studi literatur upaya penggunaan barcode di industri konstruksi
Analisa produktivitas pekerjaan pemancangan dan faktor-faktor yang mempengaruhinya dengan metode MPDM pada proyek X di Surabaya
Identifikasi dan alokasi risiko-risiko pada proyek superblok di Surabaya
Project management