Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan percent plan completed dan identifikasi faktor tidak tercapainya rencana pekerjaan pada.
Author
Jonathan, Steven
Additional Author(s)
Jaya K., Robby Dwi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011903/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 121-122.
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 122 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02784/13
(T) 658.924 Jon P
-
Unavailable : Removed
Similar Collection
by author or subject
Construction production planning and optimal control
Identifikasi dan alokasi risiko-risiko pada proyek jembatan nasional Suramadu
Building economics
Reduce, reuse, recycle, dan salvage terhadap construction waste pada proyek konstruksi di Surabaya
Studi tentang perencanaan tapak dan analisis hubungan lebar jalan terhadap luas dan harga jual kapling pada beberapa perumahan di Surabaya
Penerapan approximate cost estimate pada struktur beton bertulang bangunan ruko (SOHO)
Studi tentang kepercayaan pengembang perumahan kepada kontraktor
Analisis perencanaan dan pengendalian aliran kas untuk proyek konstruksi