Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Kajian metode takt time pada proyek konstruksi
Author
Hendy O., Kristoforus
Additional Author(s)
Willson
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012183/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
. Bibliography: p. 70-71 .
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 71 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02668/17
(T) SIP 2183
Library - 8th Floor
Available
Similar Collection
by author or subject
Faktor-faktor lapangan yang mempengaruhi produktivitas pekerja pada proyek konstruksi
Buildings and health
The Characteristics of innovative construction project: a study in Thailand construction industry
Studi kasus faktor-faktor yang dapat meningkatkan kualitas sdm sebagai modal dasar untuk menciptakan suatu perusahaan yang sehat
Case study of cost estimation procedure and development methods in RHDHV Indonesia
Pengaruh budaya keselamatan kerja pada perilaku pekerja terhadap keselamatan kerja
Analisa perhitungan/kalkulasi pemakaian peralatan & mesin lainnya.
Studi tentang generic strategy terhadap kontraktor pemula