Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Last planner system terhadap performa proyek konstruksi
Author
Dewantoro, Maximillian Maria Surjo
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Tesis No. 01000256/MTS/2018
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p.75-104
. Bibliography: p.73-74.
Abstract
-
Physical Dimension
Number of Page(s)
xiii,104 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02552/18
(T) MTS 0256
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa aspek-aspek yang mempengaruhi koordinasi pada pelaksanaan Proyek X
Analisis nilai produktivitas dan labor utilization rate tenaga kerja dengan metode work sampling
Manajemen konstruksi
Construction management fundamentals
Perhitungan produktivitas tenaga kerja pekerjaan bekisting dengan metode level of effort
Identifikasi dan alokasi risiko-risiko pada proyek jembatan nasional Suramadu
Produktifitas pekerjaan jacked pile driving dan faktor-faktor yang mempengaruhinya
Pembuatan model assessment untuk identifikasi delapan pemborosan di bidang industri konstruksi