Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus produktivitas pekerjaan produksi dan pemasangan dinding precast pada proyek apartemen
Author
Salim, Andree Surya
Additional Author(s)
Kaswara, Kulito
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011936/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix: p. 48 - 55
. Bibliography: p. 47 .
Abstract
-
Physical Dimension
Number of Page(s)
xv, 55 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01377/14
(T) 690.068 Sal S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Value engineering project report
Analisa pelaksanaan time management proyek konstruksi pada perusahaan kontraktor di Surabaya
Analisis daya tarik industri pada perusahaan real estat di Surabaya dan sekitarnya
Formwork
Construction management
Faktor-faktor penghambat value management process pada tahapan konstruksi
Model gaya kepemimpinan yang mempengaruhi kinerja bawahan
Proyek Sekolah Kristen Gloria Surabaya