Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus produktivitas pekerjaan produksi dan pemasangan dinding precast pada proyek apartemen
Author
Salim, Andree Surya
Additional Author(s)
Kaswara, Kulito
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011936/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix: p. 48 - 55
. Bibliography: p. 47 .
Abstract
-
Physical Dimension
Number of Page(s)
xv, 55 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01377/14
(T) 690.068 Sal S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi tentang inovasi teknologi alat berat dalam industri konstruksi
Analisis faktor-faktor yang mempengaruhi perpindahan pelaksana tetap pada perusahaan kontraktor di Surabaya
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak di pembangunan proyek rusun Surabaya
Identifikasi dan penanganan keterlambatan pekerjaan struktur dan finishing pada proyek sekolah 'X'
Studi tentang project closeout pada proyek gedung T (gedung kuliah dan poliklinik) Universitas Kristen Petra
Perencanaan dan penjadwalan sumber daya manusia pada proyek konstruksi dengan program primavera
Motivasi kerja pekerja pada beberapa proyek konstruksi di Surabaya
Survei tingkat kepuasan penyewa terhadap fasilitas yang disediakan pengelola di gedung perkantoran "X" Surabaya