Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus produktivitas pekerjaan produksi dan pemasangan dinding precast pada proyek apartemen
Author
Salim, Andree Surya
Additional Author(s)
Kaswara, Kulito
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011936/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix: p. 48 - 55
. Bibliography: p. 47 .
Abstract
-
Physical Dimension
Number of Page(s)
xv, 55 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01377/14
(T) 690.068 Sal S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Perhitungan produktivitas tenaga kerja pada pekerjaan pembesian dengan metode level of effort (studi kasus pada proyek X dan Y)
Identifikasi dan peringkat kriteria-kriteria prakualifikasi konsultan perencana dan konsultan pengawas
Potret penerapan perencanaan dan pengendalian jadwal proyek pada suatu kontraktor BUMN
Construction project administration
Evaluasi aspek-aspek kinerja owner pada proyek konstruksi
Studi perbandingan sistem dan prosedur di dalam manajemen material dengan manajemen bahan bangunan pada proyek konstruksi "X"
Perkreditan kontraktor kualifikasi kecil