Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus produktivitas pekerjaan produksi dan pemasangan dinding precast pada proyek apartemen
Author
Salim, Andree Surya
Additional Author(s)
Kaswara, Kulito
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011936/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix: p. 48 - 55
. Bibliography: p. 47 .
Abstract
-
Physical Dimension
Number of Page(s)
xv, 55 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01377/14
(T) 690.068 Sal S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Faktor-faktor yang mempengaruhi labor turnover dan dampaknya pada proyek konstruksi di Surabaya
Studi kasus mengenai sisa material baja tulangan pada proyek ruko
Studi tentang komunikasi verbal dalam project launch meeting
Studi kasus penerapan rekayasa nilai pada suatu proyek rumah tinggal
Analisa rumus empiris kuat tekan kolom dengan penggunaan fiber reinforced polymer pada kondisi : non-burnt, burnt-curing, dan burnt non-curing
Manajemen dalam pelaksanaan pembangunan
Analisis hubungan antara tingkat tindakan tidak aman dan keefektifan pekerja pada proyek
Pengaruh sistem manajemen k3 terhadap waktu dan biaya proyek