Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan aplikasi progam Microsoft Project dan Primavera dalam penjadwalan proyek konstruksi
Author
Octavia, Icha Kristy
Additional Author(s)
Tandoyo, Elliot Caesar
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011905/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 83-104
. Bibliography: p. 82.
Abstract
-
Physical Dimension
Number of Page(s)
xi, 104 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02610/13
(T) 658.404 Oct P
-
Unavailable : Removed
Similar Collection
by author or subject
Penentuan buffer sizing dalam penerapan critical chain project management pada sebuah proyek konstruksi
Key Performance indicators (KPIs) yang digunakan untuk mengukur kesuksesan proyek konstruksi
Identifikasi faktor-faktor yang mempengaruhi "time performance" dari kontraktor proyek ruko di Surabaya
Survei awal kesiapan kontraktor di Surabaya dalam menerapkan "Time Impact Analysis"
Studi kasus perencanaan alokasi kebutuhan bahan pada proyek konstruksi gedung kuliah dan poliklinik Universitas Kristen Petra
Studi kasus analisis rumah tumbuh di jalan raya pakal dilihat dari aspek pemasaran dan keuangan
Construction superintendent's operations manual
Penerapan faktor-faktor sukses kunci yang menunjang keberhasilan suatu proyek apartemen