Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa aspek-aspek dalam prosedur change order pada proyek konstruksi
Author
Kosasi, Michael Halmar
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2017
Language
Indonesian
ISBN
-
Series
Tesis No. 01000236/MTS/2017
Subject(s)
CIVIL ENGINEERING-CONTRACT AND SPECIFICATIONS
CONSTRUCTION PROJECTS-MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 93-175
. Bibliography: p. 92.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 175 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00595/17
(T2) MTS 0236
Library - 8th Floor
Available
Similar Collection
by author or subject
Model penilaian sukses proyek konstruksi dengan sasaran performa jadwal
Analisis nilai produktivitas dan labor utilization rate tenaga kerja dengan metode work sampling
Optimasi infrastruktur
Time, cost and architecture
Analisa spesifikasi rumah tipe 36 dalam rangka penurunan harga rumah pada Kompleks Citra Fajar Golf
Survei mengenai biaya overhead serta faktor-faktor yang mempengaruhinya
Aplikasi dan pengembangan sistem pengendalian biaya proyek untuk kontraktor (studi kasus pada suatu proyek rumah tinggal di Surabaya)
CPM in construction management