Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa aspek-aspek dalam prosedur change order pada proyek konstruksi
Author
Kosasi, Michael Halmar
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2017
Language
Indonesian
ISBN
-
Series
Tesis No. 01000236/MTS/2017
Subject(s)
CIVIL ENGINEERING-CONTRACT AND SPECIFICATIONS
CONSTRUCTION PROJECTS-MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 93-175
. Bibliography: p. 92.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 175 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00595/17
(T2) MTS 0236
Library - 8th Floor
Available
Similar Collection
by author or subject
Permasalahan yang terjadi pada gambar perencanaan dan spesifikasi teknis pada proses konstruksi
Pengendalian jadwal pada proyek bangunan gedung bertingkat di Surabaya dengan metode earned value management dan earned schedule
Analisis unsafe act dan unsafe condition pada proyek pembangunan gedung x
Industri konstruksi dan organisasi proyek
Studi kasus perbandingan berbagai bata ringan dari segi material biaya, dan produktivitas
A Decision Support for the Long Range Planning in Construction
Penerapan material requirement planning pada suatu proyek konstruksi
Analisa keterlambatan pada proyek bangunan gedung bertingkat di Surabaya dengan metode window delay analysis