Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa aspek-aspek dalam prosedur change order pada proyek konstruksi
Author
Kosasi, Michael Halmar
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2017
Language
Indonesian
ISBN
-
Series
Tesis No. 01000236/MTS/2017
Subject(s)
CIVIL ENGINEERING-CONTRACT AND SPECIFICATIONS
CONSTRUCTION PROJECTS-MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 93-175
. Bibliography: p. 92.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 175 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00595/17
(T2) MTS 0236
Library - 8th Floor
Available
Similar Collection
by author or subject
Studi tentang upah dan upah lembur tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Keterkaitan kuantitas perkerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Investment, procurement adn performance in construction
Jenis pekerjaan yang mendominasi komposisi biaya pada proyek apartemen
Pengendalian pelaksanaan struktur gedung bertingkat untuk menghasilkan cara kerja yang efektip
Project management
Analisa teori value chain terhadap kompetensi pada perusahaan kontraktor kelas a di Surabaya
Survei penerapan konsep sustainable construction di negara berkembang dan kemungkinan penerapannya di Indonesia