Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa aspek-aspek dalam prosedur change order pada proyek konstruksi
Author
Kosasi, Michael Halmar
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2017
Language
Indonesian
ISBN
-
Series
Tesis No. 01000236/MTS/2017
Subject(s)
CIVIL ENGINEERING-CONTRACT AND SPECIFICATIONS
CONSTRUCTION PROJECTS-MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 93-175
. Bibliography: p. 92.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 175 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00595/17
(T2) MTS 0236
Library - 8th Floor
Available
Similar Collection
by author or subject
Pengendalian jadwal pada proyek bangunan gedung bertingkat di Surabaya dengan metode earned value management dan earned schedule
Model bobot aktivitas sebagai dasar pendistribusian float
CPM in construction management
Proporsi komponen biaya harga bahan, upah, dan alat pada proyek konstruksi bangunan tinggi
Pembuatan dan aplikasi program simulasi kinerja backhoe-dump truck pada pemindahan tanah mekanis
Studi mengenai produktivitas tenaga kerja di proyek queen victoria
Construction equipment policy
Standarisasi jenis pekerjaan dalam rab untuk pekerjaan struktur bangunan tinggi di Indonesia