Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus perencanaan alokasi kebutuhan tenaga kerja pada proyek konstruksi gedung kuliah dan poliklinik Universitas Kristen Petra
Author
Palilingan, Aurum
Additional Author(s)
Herminto, Charles
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20401524/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
WORK MEASUREMENT
Notes
Appendix: p. 79
Bibliography: p. 78
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 79 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00985/07
(T) - 658.924 Pal S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
CPM in construction management
Last planner system terhadap performa proyek konstruksi
Analisis gaya kepemimpinan transformasional dan transaksional, budaya organisasi, dan kinerja guru TK PPPK Petra
Penerapan perencanaan produksi dan kebutuhan material di PT. Graha Cendana Abadi Mitra
Analisis kinerja tata usaha jurusan di Universitas Kristen Petra berdasarkan konsep Balanced Scorecard dengan perhitungan Data Envelopment Analysis
Construction methods and management
Studi mengenai faktor-faktor yang dapat meningkatkan produktivitas konstruksi di Surabaya
Usulan peningkatan kinerja karyawan pada departemen blow molding dan injection molding di PT. X menggunakan metode dilo