Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan pengukuran kinerja staf dengan metode MBNQA modifikasi di perusahaan x
Author
Gunawan
Additional Author(s)
Wijaya, Okta
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.02011256/IND/2007
Subject(s)
TOTAL QUALITY MANAGEMENT
WORK MEASUREMENT
Notes
Appendix: p. 92 - 106
Bibliography: p. 91
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 106 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00764/08
(T) - 658.54 Gun P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan dan pembuatan pengendali kecepatan motor universal(70 W, 100 V ac, o.7 A) melalui perintah suara manusia berbasis jaringan saraf tiruan
Taman Budaya WR Supratman di Surabaya
Mebel kayu lapis
LKP : tata letak pabrik di PT Kresna Putra
Perhitungan waktu baku dan optimalisasi kebutuhan tenaga kerja di PT Smart, Tbk.
Analisa penerapan soft quality management, hard quality management, dan job satisfaction serta pengaruhnya terhadap kinerja sekolah pada SMP Kristen Petra Surabaya
Analisa pengukuran kerja dan penjadwalan di PT. E-T-E Indonesia
Pengukuran kinerja dan usulan perbaikan di perusahaan rokok dwi tunggal.