Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi tentang analisa pembengkakan biaya dan waktu pada proyek konstruksi real estate
Author
Octavia, Ika
Additional Author(s)
Gunawan, Alex
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1315/SIP/2004
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 159 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01617/04
(T) 690.068 Oct S
-
Unavailable : Removed
Similar Collection
by author or subject
Studi literatur tentang penataan site pada proyek konstruksi bangunan tingkat tinggi
Construction scheduling with primavera project planner
Seminar sehari recent development in construction management, 28 November 1996
Analisis nilai produktivitas dan labor utilization rate tenaga kerja dengan metode work sampling
Studi mengenai faktor-faktor penyebab rework pada proyek-proyek di Surabaya
Studi literatur upaya penggunaan barcode di industri konstruksi
Perbandingan produktivitas pekerja konstruksi berdasarkan perbedaan waktu (pagi hari & siang hari)
Analisa sistem perlindungan jatuh pada proyek konstruksi di Surabaya