Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktifitas pekerjaan jacked pile driving dan faktor-faktor yang mempengaruhinya
Author
Prakasa, Tigor
Additional Author(s)
Alexander, Jourdan
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011684/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 73 - 98
Bibliography : p. 72
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 98 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02782/09
(T) 690.068 Pra P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Manajemen konstruksi
CPM in construction management
Hubungan antara taktik dan hasil negosiasi dalam penyelesaian sengketa jasa konstruksi
Studi faktor-faktor penyebab change order pada proyek konstruksi di Surabaya yang menggunakan kontrak traditional serta design-build
Analisis daya tarik industri pada perusahaan real estat di Surabaya dan sekitarnya
Metode gabungan critical path method dan line of balance dan penerapannya pada proyek perumahan yang berulang
Modifikasi teknik discrete shear GAP pada elemen balok timoshenko berbasis kriging dan pembentukan elemen makro segitiga pelat reissner-mindlin
Analisa kepuasan pengembang terhadap kualitas konstruksi pada perumahan kelas menengah di Surabaya