Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Jenis pekerjaan yang mendominasi komposisi biaya pada proyek apartemen
Author
Kusuma, Eveline Felicia
Additional Author(s)
Sugianto, Budi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011675/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Bibliography : p. 118 - 119
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 119 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03245/09
(T) 690.068 Kus J
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis prioritas kekritisan rework dan penyebabnya yang terjadi pada suatu proyek sekolah dengan menggunakan metode Failure Modes and Effects Analysis (FMEA)
Studi kasus aplikasi critical path method with multiple calendars pada proyek graha bukopin
Faktor-faktor yang mempengaruhi kinerja (performance) sumber daya manusia di tingkat menengah (mid level) manajemen pada perusahaan jasa konstruksi di Surabaya
Construction management
Faktor-faktor yang mempengaruhi harga perumahan skala kecil di Surabaya dan sekitarnya
Model pengukuran kemampuan manajer proyek berbasis kompetensi
Studi kasus mengenai struktrur organisasi pelaksana lapangan pada proyek konstruksi di Surabaya
Studi kasus penerapan metode collapsed as-built terhadap sebuah bangunan perkuliahan di kota Surabaya