Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengukuran produktivitas pekerjaan dinding hebel studi kasus pada proyek apartemen x
Author
Chandra P, Stevanus Cris
Additional Author(s)
Wijaya, Lius Chandra
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011726/SIP/2010
Subject(s)
TIME STUDY
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 46 - 63
Bibliography : p. 45
Abstract
-
Physical Dimension
Number of Page(s)
xi, 63 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03556/10
(T) 690.068 Cha P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengendalian jadwal pada proyek bangunan gedung bertingkat di Surabaya dengan metode earned value management dan earned schedule
Sistem jaminan kualitas dan biaya kualitas pada proyek tangki elpiji
Studi literatur tentang prinsip-prinsip lean construction
Perbandingan produktivitas tenaga kerja untuk beberapa jenis pekerjaan pada bangunan perumahan
Strategi perusahaan konstruksi di Surabaya di era krisis
Proporsi biaya tiap satuan pekerjaan struktur beton bertulang proyek konstruksi bangunan tinggi
Analisa standarisasi kerja operator bush forming dan pin cutting menggunakan metode tabel standar kombinasi kerja di PT. XYZ
Analisa pelaksanaan time management proyek konstruksi pada perusahaan kontraktor di Surabaya