Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengukuran produktivitas pekerjaan dinding hebel studi kasus pada proyek apartemen x
Author
Chandra P, Stevanus Cris
Additional Author(s)
Wijaya, Lius Chandra
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011726/SIP/2010
Subject(s)
TIME STUDY
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 46 - 63
Bibliography : p. 45
Abstract
-
Physical Dimension
Number of Page(s)
xi, 63 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03556/10
(T) 690.068 Cha P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Identifikasi elemen-elemen penghambat dalam penerapan ISO 9002 pada perusahaan konstruksi serta upaya penanggulangannya
Program optimasi jumlah backhoe- dump truck dalam operasi penggalian tanah mekanis
Faktor demotivasi staf profesional pada perusahaan kontraktor di Surabaya
Analisa sensitifitas penetapan harga proyek "X" dengan model fair and reasonable markup (FARM)
Studi kasus perencanaan alokasi kebutuhan tenaga kerja pada proyek konstruksi gedung kuliah dan poliklinik Universitas Kristen Petra
Time, cost and architecture
Analisis produktivitas jam normal dan jam lembur pada pekerjaan struktur beton bertulang
Analisis waktu pekerjaan finishing pada proyek apartemen